GENERAL INFORMATION - TM-10-4610-309-140013Purpose of Equipment - TM-10-4610-309-140014OZONE DEPLETING SUBSTANCES (ODS)EQUIPMENT CHARACTERISTICS, CAPABILITIES, AND FEATURES - TM-10-4610-309-140017Figure 1. Left End and Front Views of the MC-TWPS Packed Out.Figure 4. MC-TWPS General Purpose Cover.Figure 5. A-TWPS Packed Out for Deployment.A-TWPS Flat Rack and Fabric WallLOCATION AND DESCRIPTION OF MAJOR COMPONENTS - TM-10-4610-309-140022Diesel Engine Driven Raw Water Pump P-1Micro-Filtration System - TM-10-4610-309-140024Figure 9. MF System: Strainer S-2 to MF Modules.Figure 10. MF System: MF Modules to Discharge to RO Feed Tank.Figure 11. MF System: MF Modules to Waste Outlet.Reverse Osmosis (RO) System - TM-10-4610-309-140028Figure 13. RO System: RO Feed Pump to High Pressure Pumps.Figure 15. RO System: High Pressure Pumps to RO Vessels.Figure 16. RO System: RO Vessels to Waste Out.RO Product Flow Three-Way Valves V-501 through V-510Figure 17. RO System: RO Vessels to Product Out.Figure 18. Air System: Air Compressor Assembly and Two-Stage Filtration System.Figure 19. Air System: Section 1, Air Receiver Tank R-1, and Pressure Switch PSL/PSH-901.Figure 20. Air System: Section 3.Figure 21. Air System: Section 4.Figure 23. Air System: Instrument/Solenoid Panel Box.Chemical Injection System - TM-10-4610-309-140039Figure 25. Sodium Bisulfite Chemical Injection Point.Figure 28. Major Components of the Standard Product Water Distribution System.Figure 29. Major Components of the Extended Product Water Distribution System.Operating Controls - TM-10-4610-309-140043Figure 32. Major Components of the Power Distribution System.Cold Weather Kit - TM-10-4610-309-140045Figure 33. Major Components of the Cold Weather Kit.Figure 34. Additional Cold Weather Components for the A-TWPS.Figure 36. Cleaning Waste Discharge and Storage Components.Figure 37. Major Components of the Ocean Intake Structure System (OISS) Kit.Figure 38. Major Components of the NBC Water Treatment System.NBC Survivability KitDIFFERENCES BETWEEN MODELSEQUIPMENT DATA - TM-10-4610-309-140053THEORY OF OPERATION - TM-10-4610-309-140055Figure 1. TWPS Flow Diagram.Figure 2. Main Components of the Raw Water System.RAW WATER SYSTEM - TM-10-4610-309-140058RAW WATER SYSTEM (cont)MICROFILTRATION (MF) SYSTEMFigure 4. MF System: Strainer S-2 to MF Modules.Figure 6. Micro-Filtration (MF) Process.MICROFILTRATION SYSTEM BACKWASH OPERATIONFigure 8. MF Backwash Operation.REVERSE OSMOSIS (RO) SYSTEM - TM-10-4610-309-140065REVERSE OSMOSIS (RO) SYSTEM (cont)Figure 9. RO System: RO Feed Tank to High Pressure Pump Inlets.Figure 11. RO System: High Pressure Pumps to RO Vessels.Figure 12. Reverse Osmosis Process.Figure 13. RO System: RO Vessels to Waste Out.Figure 14. RO System: RO Vessels to Product Out.AIR SYSTEM - TM-10-4610-309-140072Figure 15. Air System Overview.Air Compressor and PSL/PSH-901 AssemblyTwo-Stage Air Filtration SystemAir System Section 1Air System Section 3Air System Section 4Air System Section 6Air Manifold AssemblyCHEMICAL INJECTION SYSTEM - TM-10-4610-309-140081Figure 24. Adaptor A-11 Sodium Bisulfite Injection Point.STANDARD PRODUCT WATER DISTRIBUTION SYSTEMEXTENDED PRODUCT WATER DISTRIBUTION SYSTEM (A-TWPS ONLY)OPERATING CONTROLS - TM-10-4610-309-140085CLEANING AND PRESERVATION OPERATIONSFigure 30. MF Cleaning Operation.COLD WEATHER MODULESITE SELECTIONTWPS COMPONENT LOCATIONFigure 1. Typical TWPS Work Site Dimensions.P-2 Pump Only Raw Water System ConfigurationFigure 3. P-1 Pump Only Raw Water System Configuration.Figure 4. P-1 Pump to P-2 Pump to Cyclone Separator Raw Water System Configuration.ADDITIONAL COMPONENT LOCATION CONSIDERATIONSEQUIPMENT OFF-LOADING ARMY UNITA-TWPS REMOVAL FROM PLS TRAILEREQUIPMENT OFF-LOAD - TM-10-4610-309-140099Preparation for Equipment Off-LoadFigure 4. Operator Station End Panels.Figure 5. Flat Rack Top Panel and Deck.Figure 7. Deck Support Assembly.Operator Station Off-load - TM-10-4610-309-140104Operator Station Off-load (cont) - TM-10-4610-309-140105Equipment Area Off-load - TM-10-4610-309-140106Figure 10. MF Pump Skid Removal.Generator Area Off-LoadFigure 12. Typical Generator Area Packout - Rear.Flat Rack Panel, Duct, Suction Hose, and OISS Off-LoadEQUIPMENT OFF-LOADING MARINE CORPS UNITEQUIPMENT OFF-LOAD - TM-10-4610-309-140112Operator Station Off-Load - TM-10-4610-309-140113Figure 3. Typical Operator Station Packout Side View.Operator Station Off-Load (cont) - TM-10-4610-309-140115Operator Station Roof RaisingFigure 6. Operator Station Overhead Support Beam Removal and Roof Raising.Equipment Area Off-Load - TM-10-4610-309-140118Figure 8. Equipment Area Off-Load 1.Figure 9. Equipment Area Off-Load 2.Figure 10. Roof Support Sheet Positioning.SET-UP OPERATION UNDER USUAL CONDITIONSPLANNING AND ORGANIZATION - TM-10-4610-309-140124AIR COMPRESSOR START-UPFigure 1. P-1 Pump to P-2 Pump to Cyclone Separator Configuration Deployment.P-1 PUMP TO P-2 PUMP TO CYCLONE SEPARATOR CONFIGURATION DEPLOYMENTP-2 PUMP OR P1 PUMP ONLY CONFIGURATION DEPLOYMENTFigure 4. P-1 Pump Only Configuration Deployment.SODIUM BISULFITE SYSTEM SET-UP - TM-10-4610-309-140130FLOATING INLET STRAINER AND ANCHOR DEPLOYMENTFigure 5. Anchor, Rope, Inlet Strainer, and Hoses Assembled On-Shore.Figure 6. Raw Water Inlet System Deployment.Figure 7. MF Equipment Deployment.WASTE OUTLET CONNECTIONSMAKING POWER CABLE CONNECTIONS TO THE TWPSFigure 9. Pump Skid Power Cable Connections.STANDARD DISTRIBUTION SYSTEM SET-UPSTANDARD DISTRIBUTION SYSTEM SET-UP (cont)PRE-OPERATIONAL CHECKS - TM-10-4610-309-140140Figure 11. High Pressure Pump Mounting Flange Drain Tube.FABRIC WALL SET-UP (A-TWPS)EXTENDED DISTRIBUTION SYSTEM SET-UP (A-TWPS)Figure 13. Extended Product Water Distribution System Equipment DeploymentConnect the hoses - TM-10-4610-309-140145LOWERING AND RAISING THE BAIL BAR (A-TWPS)Figure 15. Removing the Bolts from the Bail Bar.Figure 16. Flat Rack Bail Bar Lowered.Figure 17. Correct Bail Bar Bolt Installation Locations.OCEAN INTAKE STRUCTURE SYSTEM (OISS) SET-UP OPERATIONLAYOUT OISSFigure 2. Set-Up for Jetting a Wellpoint.JETTING THE FIRST WELLPOINTJETTING THE SECOND WELLPOINTJETTING THE FOURTH WELLPOINTCOLD WEATHER SET-UP OPERATION UNDER UNUSUAL CONDITIONSFigure 1. Drawings of Components of the Cold Weather Kit Common to A-TWPS and MC-TWPS.Table 2. Listing of Components of the Cold Weather Kit Common to A-TWPS and MC-TWPS.Figure 2. Drawings of Additional Cold Weather Components for A-TWPS.Figure 3. MC-TWPS Winter Cover.PLANNING AND ORGANIZATION - TM-10-4610-309-140162TWPS SKID COVER INSTALLATIONFigure 5. Winter Cover Top Panel Installation (MC-TWPS).Figure 7. Winter Cover Installation Detail (MC-TWPS).Figure 8. Operator Station Overhead Support Beam Removal and Roof Raising.Figure 9. Fabric Wall Installation (A-TWPS).DIESEL HEATER DEPLOYMENTFigure 10. Diesel Heater, Plenum, and Duct Installation.Figure 11. Diesel Fuel-Fired Heater Controls.SET UP THE RAW WATER SYSTEMFigure 12. P-1 Pump to P-2 Pump Configuration Deployment.P-2 PUMP ONLY CONFIGURATION DEPLOYMENTSODIUM BISULFITE SYSTEM SET-UP - TM-10-4610-309-140174MICRO-FILTRATION (MF) EQUIPMENT SET-UPPUMP, HOSE, AND ADAPTOR HEATERS AND PUMP SKID COVER INSTALLATIONFigure 15. P-2 and P-3 Pump Heating Collar Installation.Figure 16. Hose Heating Blanket Installation.Table 6. Heating Blanket Installation List for P-1 to P-2 Raw Water Configuration.Figure 19. Adaptor A-02 Heating Blanket and Collar Installation.Figure 20. Pump Skid Insulating Cover Installation.Figure 21. Waste Outlet Connection.Figure 22. Making Pump Skid Power Cable Connections.HEAT-UP AND OPERATING TEMPERATURE REQUIREMENTSFigure 24. Product Water Distribution System Equipment Deployment.Figure 25. A-TWPS Product Water Door Access Cover Installation.Install a pump heating collar on Motor-Driven Product Water Distribution Pump P-7Table 8. Product Water Distribution Hose Heating Blanket Installation and Connection List.Figure 27. Distribution Pump Skid P-7 Insulating Cover Installation.RAW WATER INTAKE DEPLOYMENTCOMPLETING P-1 PUMP SETUP (IF IN USE) AND ESTABLISHING RAW WATER FLOW - TM-10-4610-309-140191Figure 30. 24-Volt Cable Connection to the Diesel Engine-Driven Pump Skid.COMPLETING P-1 PUMP SETUP (IF IN USE) AND ESTABLISHING RAW WATER FLOW - TM-10-4610-309-140193PRE-OPERATIONAL CHECKS - TM-10-4610-309-140194Figure 31. Extended Product Water Distribution System Equipment Deployment.Connect the hoses - TM-10-4610-309-140196Table 9. Extended Distribution Hose Heating Blanket Installation and Connection List.Ready Diesel-Driven Distribution Pump P-8.Complete the hose and blanket installationConnect the Distribution Pump Skid P-8 power cable to the PDPOTHER SET-UPS - OPERATION UNDER UNUSUAL CONDITIONSFigure 1. Adaptor A-11 Location in the Raw Water System.CONTAMINATION AVOIDANCE COVER (CAC) DEPLOYMENTNBC SYSTEM DEPLOYMENTFigure 4. NBC System Deployment.HOT WEATHER CONDITION SET-UPDESCRIPTION & USE OF OPERATOR CONTROLS & INDICATORSOPERATOR CONTROL PANEL (OCP)Table 1. Operator Control Panel (OCP) Switches.Table 2. Operator Control Panel (OCP) LED Displays.Table 3. Operator Control Panel (OCP) Indicators.POWER DISTRIBUTION PANEL DOORPOWER DISTRIBUTION PANEL (PDP)Table 5. Power Distribution Panel Controls and Indicators.FEED FLOW CONTROL PANEL - TM-10-4610-309-140215CHEMICAL INJECTION PUMP CONTROLSAIR SYSTEM CONTROLS AND INDICATORSINSTRUMENT/SOLENOID PANELRAW WATER SYSTEM CONTROLS AND INDICATORSMICRO-FILTRATION SYSTEM CONTROLS AND INDICATORSTable 11. Micro-Filtration System Controls and Indicators.REVERSE OSMOSIS SYSTEM CONTROLS AND INDICATORSFigure 4. Location of Controls and Indicators in the Reverse Osmosis SystemTable 12. Reverse Osmosis System Controls and Indicators.STANDARD PRODUCT WATER DISTRIBUTION SYSTEM CONTROLSEXTENDED PRODUCT WATER DISTRIBUTION SYSTEM CONTROLSCOLD WEATHER KIT CONTROLSTACTICAL QUIET GENERATOR CONTROLS AND INDICATORSESTABLISHING ELECTRICAL POWER OPERATION UNDER USUAL CONDITIONSGROUND ROD ASSEMBLY INSTALLATIONFigure 2. Slide Hammer Assembled to Drive the First Ground Rod.PREPARING THE TWPS FOR POWERENERGIZING THE TWPS POWER DISTRIBUTION PANELPRE-OPERATIONAL DIAGNOSTIC SELF TEST PROCEDURESDIAGNOSTIC SELF-TESTSFigure 2. Automatic Valves.DIAGNOSTIC SELF-TESTS (cont) - TM-10-4610-309-140238DIAGNOSTIC SELF-TESTS (cont) - TM-10-4610-309-140239Figure 3. Solenoid Valves XV-901, XV-902, and XV-903 Location.Table 1. Diagnostic Self-Tests Summary.INITIAL START-UP OR START-UP WITH THE SYSTEM FULLY DRAINEDINITIAL INSPECTIONS, CHECKS AND ADJUSTMENTSTable 1. Valve Start-Up Position Initial Startup or Fully Drained. - TM-10-4610-309-140245Figure 2. Location of Valves for Start-Up. - TM-10-4610-309-140246SODIUM BISULFITE CHEMICAL SYSTEM START-UPESTABLISHING RAW WATER FLOW WITH BOTH RAW WATER PUMPSESTABLISHING RAW WATER FLOW WITH BOTH RAW WATER PUMPS (cont)Figure 5. Diesel Engine Controls.ESTABLISHING RAW WATER FLOW WITH ONLY THE MOTOR-DRIVEN RAW WATER PUMP - TM-10-4610-309-140251ESTABLISHING RAW WATER FLOW WITH ONLY THE MOTOR-DRIVEN RAW WATER PUMP (cont)FLUSHING PRESERVATIVE/CLEANING SOLUTIONFigure 7. Cleaning Waste Hose Set-Up With the Cleaning Waste Tank.Figure 8. Cleaning Waste Hose Set-Up Without the Cleaning Waste Tank.FLUSHING PRESERVATIVE/CLEANING SOLUTION (cont)MICRO-FILTRATION SYSTEM START-UP - TM-10-4610-309-140257RO SYSTEM START-UP - TM-10-4610-309-140258ANTISCALANT AND HYPOCHLORITE CHEMICAL SYSTEMS START-UPTable 2. Free Chlorine Required, mg/LCOMPLETING START-UP - TM-10-4610-309-140261Table 3. Hypochlorite System Setup 4 oz (1 packet) Hypochlorite Mixed in 4 GallonsTable 3. Hypochlorite System Setup 8 oz (2 packet) Hypochlorite Mixed in 4 GallonsTable 5. Hypochlorite System Setup. 16 oz (4 packets) or 24 oz (6 packets) Hypochlorite Mixed in 4 GallonsSTART-UP AFTER A SHORT TERM OR STANDBY SHUTDOWN WITHOUT DRAININGTable 1. Valve Start-Up Position Start-Up After Short Term or Standby Shutdown.Figure 2. Location of Valves for Start-Up. - TM-10-4610-309-140267ESTABLISHING ELECTRICAL POWERFigure 3. Raw Water System with Both Raw Water Pumps.Figure 4. Diesel Engine Controls.ESTABLISHING RAW WATER FLOW WITH ONLY THE MOTOR-DRIVEN RAW WATER PUMP - TM-10-4610-309-140271Figure 5. Raw Water System with Only the Motor-Driven Raw Water Pump.MICRO-FILTRATION SYSTEM START-UP - TM-10-4610-309-140273RO SYSTEM START-UP - TM-10-4610-309-140274COMPLETING START-UP - TM-10-4610-309-140275MAINTAINING NORMAL OPERATION UNDER USUAL CONDITIONSPERFORMING ROUTINE SCHEDULE SERVICESTable 1. Schedule of Routine Crew Operational ServicesPRODUCT DISTRIBUTIONMC-TWPS TDS MeasurementMC-TWPS pH MeasurementMC-TWPS Free Chlorine MeasurementCHECKING AND REFILLING THE ANTISCALANT CHEMICAL SYSTEMCHECKING AND REFILLING THE BISULFITE CHEMICAL SYSTEMEVALUATING RO % CLEAN AND RO % SALT REJECTIONTable 3. Expected Salt Rejection Readings.Table 4. RO Cleaning Schedule.MF Sonic TestFigure 6. Isolating an MF Module.Figure 7. RO Vessel 3-Way Valve Positions.Figure 8. RO Element Product Water Flow Test Setup.Figure 9. RO Element Product Water Conductivity Test Setup.Table 5. Normal Alarms and Alarm Responses.Table 5. Normal Alarms and Alarm Responses Continued. - TM-10-4610-309-140295Table 5. Normal Alarms and Alarm Responses Continued. - TM-10-4610-309-140296Table 5. Normal Alarms and Alarm Responses Continued. - TM-10-4610-309-140297Table 5. Normal Alarms and Alarm Responses Continued. - TM-10-4610-309-140298NORMAL INSTRUMENT READINGS AND RESPONSE TO CHANGESTable 6. Normal Instrument Readings and Response to ChangesTable 6. Normal Instrument Readings and Response to Changes Continued.INTERCHANGING CHEMICAL PUMPSFigure 10. Chemical Pumps.Figure 11. Distribution System.INTERCHANGING RAW WATER AND DISTRIBUTION PUMPSINTERCHANGING RAW WATER AND DISTRIBUTION PUMPS (cont)STANDBY OR SHORT-TERM SHUTDOWNTable 1. Summary of Standby and Short-Term Shutdown Requirement.STANDBY SHUTDOWN WITHOUT DRAINING DOWNSTANDBY SHUTDOWN COLD WEATHER OPERATIONTable 2. Drain and Vent Valve Position for Drain-Down.Figure 3. Location of Valves for Drain-Down.SHORT TERM SHUTDOWN - NORMAL OPERATIONSHORT TERM SHUTDOWN - NORMAL OPERATION (cont)SHORT TERM SHUTDOWN - COLD WEATHER OPERATIONFigure 6. Strainer S-2 Drain Valve V-109 and Vent Valve V-110.Figure 7. Auxiliary Air Hose Quick Disconnect Connections.Figure 8. RO Element Three Way Valve in the Drain Position.SHORT TERM SHUTDOWN - COLD WEATHER OPERATION (cont)RAW WATER DIESEL ENGINE SHUTDOWNEXTENDED SHUT-DOWN DURING DEPLOYMENTEXTENDED SHUTDOWN PROCEDURETable 1. Valve Start-Up Position Initial Startup or Fully Drained. - TM-10-4610-309-140323Figure 2. Location of Valves for Start-Up. - TM-10-4610-309-140324Figure 3. RO Element 3-Way Valve in the Drain Position.Table 2. Valve Ending Position Extended Shut-Down.Figure 4. Location of Valves for Extended Shut-Down.EMERGENCY SHUT-DOWNFigure 1. Emergency Shut-Down Controls.CLEANING, PRESERVATION, AND CLEANING WASTE NEUTRALIZATION AND PUMP-OUTRO ACID CLEANING - TM-10-4610-309-140332MF CLEANING WITH RO ACID CLEANING - TM-10-4610-309-140333MF PRESERVATIONCLEANING WASTE NEUTRALIZATION AND PUMP-OUTFigure 1. Cleaning Waste Recirculation Set-Up.Figure 2. Cleaning Waste Pump-Out Set-Up.CLEANING WASTE NEUTRALIZATION AND PUMP-OUT (cont)MICRO-FILTRATION SYSTEM CLEANINGFigure 1. Cleaning Waste Storage Tank Set-Up.Figure 2. Valves for Shutdown to Standby for MF Acid Cleaning.Backwash the MF - TM-10-4610-309-140342Acid Cleaning Solution Preparation - TM-10-4610-309-140343Acid Cleaning Solution Preparation (cont)MF Drain - TM-10-4610-309-140345Figure 5. MF Acid Cleaning Waste Hose Set-Up with the Cleaning Waste Tank.Figure 7. Valves for MF Acid Cleaning.MF Acid Cleaning - TM-10-4610-309-140348MF Acid Cleaning (cont) - TM-10-4610-309-140349MF Caustic Detergent Cleaning - TM-10-4610-309-140350MF Caustic Detergent Cleaning (cont) - TM-10-4610-309-140351Figure 9. Valves for MF Caustic Detergent Cleaning.MF Caustic Detergent Cleaning (cont) - TM-10-4610-309-140353Figure 10. Valves for Flushing RO Feed Tank.MF Caustic Detergent Cleaning (cont) - TM-10-4610-309-140355REVERSE OSMOSIS SYSTEM ACID CLEANINGRO ACID CLEANING - TM-10-4610-309-140358Figure 2. Valves for Shutdown to Standby and Drain for RO Acid Clean.Figure 3. Cleaning Waste Hose Set-Up with the Cleaning Waste Tank.Figure 5. Valves for Preparing Water for RO Acid Cleaning.Prepare the RO acid cleaning solutionFigure 6. Adaptor A-12 Valve V-705 in Cleaning Waste Hose Line. - TM-10-4610-309-140363Figure 8. Valves for RO Acid Cleaning.Figure 9. Valves for Second RO Product Water Flush. - TM-10-4610-309-140365End the RO Acid CleaningREVERSE OSMOSIS SYSTEM DETERGENT CLEANINGRO DETERGENT CLEANINGFigure 2. Valves for Shutdown to Standby and Drain for RO Detergent Cleaning.Figure 3. RO Detergent Cleaning Waste Hose Set-Up with the Cleaning Waste Tank.Figure 5. Valves for Preparing Water for RO Detergent Cleaning.Prepare the RO detergent cleaning solutionFigure 6. Adaptor A-12 Valve V-705 in Cleaning Waste Hose Line. - TM-10-4610-309-140373Figure 8. Valves for RO Detergent Cleaning.Figure 9. Valves for Second RO Product Water Flush. - TM-10-4610-309-140375End the RO Detergent CleaningMICRO-FILTRATION SYSTEM CLEANING WITH REVERSE OSMOSIS SYSTEM ACID CLEANINGMF CLEANING WITH RO ACID CLEANING - TM-10-4610-309-140378Figure 2. Valves for Shutdown to Standby for MF and RO Acid Cleaning.Backwash the MF - TM-10-4610-309-140380Acid Cleaning Solution Preparation - TM-10-4610-309-140381MF Drain - TM-10-4610-309-140382RO Acid Cleaning - TM-10-4610-309-140383Figure 6. MF Acid Cleaning Waste Hose Set-Up Without the Cleaning Waste Tank.Figure 7. Distribution Tank Adaptor A-15 Valve V-525.Figure 9. Auxliary Air Hose Connections for Force-Air Draining the RO Elements.MF Acid Cleaning - TM-10-4610-309-140387MF Acid Cleaning (cont) - TM-10-4610-309-140388MF Acid Cleaning (cont) - TM-10-4610-309-140389Figure 11. Valves for Flushing the RO Feed Tank.MF Caustic Detergent Cleaning - TM-10-4610-309-140391Figure 12. Valves for MF Caustic Detergent Cleaning.MF Caustic Detergent Cleaning (cont) - TM-10-4610-309-140393Figure 13. Valves for Flushing RO Feed Tank.PRESERVATIONREVERSE OSMOSIS SYSTEM PRESERVATIONRO PRESERVATION FLUSH FOR EXTENDED SHUTDOWNFigure 2. Cleaning Waste Hose Set-Up with the Cleaning Waste Tank. - TM-10-4610-309-140399Figure 4. Valves for Preparing Water for RO Preservation Flush.Figure 5. Distribution Tank Adaptor A-15 Valve V-525.Figure 6. Valves for RO Preservation FlushFigure 7. Valves to Operate at the End of RO Preservation Flush.Figure 8. Product RO Element Three Way Valve in the Drain Position.RO PRESERVATION IN PREPARATION FOR STORAGEFigure 10. Cleaning Waste Hose Set-Up with the Cleaning Waste Tank.Figure 12. Valves for Preparing Water for RO Preservation.Figure 13. Distribution Tank Adaptor A-15 Valve V-525.Figure 14. Valves for RO Preservation.Figure 15. Valves to Operate at the End of RO Preservation for Storage.PREPARATION FOR STORAGEMICRO-FILTRATION SYSTEM PRESERVATIONMF PRESERVATION FLUSH FOR EXTENDED SHUTDOWNFigure 2. Cleaning Waste Hose Set-Up with the Cleaning Waste Tank. - TM-10-4610-309-140415Figure 4. Valves for Preparing Water for MF Preservation Flush.MF PRESERVATION FLUSH FOR EXTENDED SHUTDOWN (cont) - TM-10-4610-309-140417MF PRESERVATION FLUSH FOR EXTENDED SHUTDOWN (cont) - TM-10-4610-309-140418Figure 5. MF Drain Valves V-203 and V-403.Figure 6. Valves to Flush RO Feed Tank After MF Preservation Flush.MF PRESERVATION IN PREPARATION FOR STORAGEOPERATION UNDER UNUSUAL CONDITIONS - TM-10-4610-309-140423Cold Weather Initial Startup or Startup with the System Fully DrainedHeat-up the TWPS systemsFigure 2. Valves Operated to Heat Up the TWPS Systems.Figure 3. MF Assembly.Cold Weather Emergency Shutdown on Loss of PowerFigure 5. Drains to Open for Cold Weather Emergency Shutdown.NBC DECONTAMINATION WATER PURIFICATION MISSIONDouble Pass NBC Filtration Using One TWPSFigure 8. A-TWPS First Pass Set-Up for Double Pass NBC Filtration Using One TWPS.Double Pass NBC Filtration Using One TWPS (cont)Figure 9. MC-TWPS Second Pass Set-Up for Double Pass NBC Filtration Using One TWPS.Figure 10. A-TWPS Second Pass Set-Up for Double Pass NBC Filtration Using One TWPSDouble Pass NBC Filtration Using Three TWPSFigure 11. Double Pass NBC Filtration Set-Up Using Three TWPS Units.Double Pass NBC Filtration Using Three TWPS (cont)EQUIPMENT DECONTAMINATION AFTER AN NBC WATER PURIFICATION MISSIONChemical/Biological DecontaminationNBC SURVIVABILITYLOW EMI EMISSIONS MISSIONSPREPARATION FOR MOVEMENT ARMY UNITPREPARATION FOR PACKOUT - TM-10-4610-309-140444Figure 1. Rolling Up the Hose Heating Blankets. - TM-10-4610-309-140445Figure 2. Quick-Disconnect Air Hose Connections.Figure 3. Folding Up the Fabric Wall.Operator's Tool Kit - TM-10-4610-309-140448Table 3. Operator's Tool Kit.BII Box #1 - TM-10-4610-309-140450Table 4. BII Box #1.BII Box #2BII Box #3 - TM-10-4610-309-140453BII Box #4 - TM-10-4610-309-140454BII Box #5 - TM-10-4610-309-140455BII Bucket #6 - TM-10-4610-309-140456BII Bucket #7 - TM-10-4610-309-140457BII Box #8 - TM-10-4610-309-140458Table 11. BII Box #8.Manuals Storage Box - TM-10-4610-309-140460Left End Packout - TM-10-4610-309-140461Ocean Intake Structure System (OISS) PackoutFigure 7. OISS Component Packout.Suction Hose PackoutHeating Duct PackoutOperator Station Packout - TM-10-4610-309-140466Figure 12. Operator Station Packout 3Figure 13. Pump Skid Retaining Rods.Figure 15. Operator Station Packout 5.Equipment Area Packout - TM-10-4610-309-140470Figure 18. Equipment Area Packout 2.Figure 19. Equipment Area Packout 3.Figure 20. Filtrate Drain/Sample Hose and RO Element Pusher Packout.Figure 21. Correct Bail Bar Bolt Installation Locations.Figure 22. Flat Rack Panel #5, #6, and #7 Installation.Figure 23. Generator Area Packout 1.Figure 24. Generator Area Packout 2.Figure 25. Cargo Net and Strap Placement.Figure 26. Flat Rack Hinged Top Panel Closure.Figure 28. Flat Rack Panel Installation.Preparing to Load the A-TPWS on a PLS TrailerPREPARATION FOR MOVEMENT MARINE CORPS UNITEXTENDED CAPABILITY MODULESPREPARATION FOR PACKOUT - TM-10-4610-309-140485Figure 1. Quick-Disconnect Air Hose Connections.Operator's Tool Kit - TM-10-4610-309-140487Table 1. Operator's Tool Kit.BII Box #1 - TM-10-4610-309-140489Table 2. BII Box #1.BII Box #3 - TM-10-4610-309-140491BII Box #4 - TM-10-4610-309-140492BII Box #5 - TM-10-4610-309-140493BII Bucket #6 - TM-10-4610-309-140494BII Bucket #7 - TM-10-4610-309-140495BII Box #8 - TM-10-4610-309-140496Table 8. BII Box #8.Manuals Storage Box - TM-10-4610-309-140498Left End Packout - TM-10-4610-309-140499Operator Station Packout - TM-10-4610-309-140500Figure 4. Left End RO Element Drain Hoses and RO Vessel Drain Hose.Figure 6. Operator Station Packout 2.Figure 8. Operator Station Packout 4.Figure 9. Operator Station Packout 5.Figure 11. Operator Station Packout 5 and 6.Figure 12. Operator Station Packout 7.Figure 13. Operator Station Packout 8.Equipment Area Packout - TM-10-4610-309-140508Figure 15. Equipment Area Packout 2.Figure 16. Equipment Area Packout 3.Figure 17. Equipment Area Packout 4.Figure 18. Equipment Area Packout 5.Right End PackoutTransport Reinforcing Chain InstallationGeneral Purpose Cover InstallationFigure 24. MC-TWPS General Purpose Cover Installation.Cargo Net InstallationFigure 26. Front Cargo Net Storage Installation.Figure 27. Side Cargo Net Installation.Loading and Securing the MC-TWPS to an MTVRFigure 28. MC-TWPS Strapped to MTVR.PREPARATION FOR MOVEMENT MARINE CORPS EXTENDED CAPABILITY MODULESCOLD WEATHER MODULE PACKOUTFigure 1. Rolling Up the Hose Heating Blankets. - TM-10-4610-309-140525Cold Weather Module Box PackoutFigure 3. Cold Weather Module Box Packout.CLEANING WASTE STORAGE MODULE PACKOUTNBC WATER TREATMENT SYSTEM MODULE PACKOUTNBC SURVIVABILITY MODULE PACKOUTOCEAN INTAKE STRUCTURE SYSTEM (OISS) MODULE PACKOUTFigure 8. Bags with OISS Risers Packed onto MC-TWPS.Figure 9. Bag with OISS Wellpoints Packed onto MC-TWPS.PREPARATION FOR STORAGE ARMY UNITFigure 1. Raw Water System Flush Layout. - TM-10-4610-309-140536MF Feed Tank and P-3 Pump - TM-10-4610-309-140537RO System - TM-10-4610-309-140538Figure 4. RO Product 3-Way Valve in the Drain Position. - TM-10-4610-309-140539Figure 5. Chemical System Component Removal for Draining the System. - TM-10-4610-309-140540DIESEL ENGINE PRESERVATION - TM-10-4610-309-140541WINTER HEATER PRESERVATION - TM-10-4610-309-140542AIR SYSTEM PRESERVATION - TM-10-4610-309-140543Figure 9. Vent Valves V-904 and V-910 and Shut-Off Valve V-909. - TM-10-4610-309-140544CORROSION PREVENTION - TM-10-4610-309-140545SHIPPING AND STORAGE INSTRUCTIONS - TM-10-4610-309-140546PREPARATION FOR STORAGE MARINE CORPS UNITFigure 1. Raw Water System Flush Layout. - TM-10-4610-309-140548MF Feed Tank and P-3 Pump - TM-10-4610-309-140549RO System - TM-10-4610-309-140550Figure 4. RO Product 3-Way Valve in the Drain Position. - TM-10-4610-309-140551Figure 5. Chemical System Component Removal for Draining the System. - TM-10-4610-309-140552DIESEL ENGINE PRESERVATION - TM-10-4610-309-140553WINTER HEATER PRESERVATION - TM-10-4610-309-140554AIR SYSTEM PRESERVATION - TM-10-4610-309-140555Figure 9. Vent Valves V-904 and V-910 and Shut-Off Valve V-909. - TM-10-4610-309-140556CORROSION PREVENTION - TM-10-4610-309-140557SHIPPING AND STORAGE INSTRUCTIONS - TM-10-4610-309-140558OPERATOR/CREW TROUBLESHOOTING PROCEDURESRAW WATER SYSTEM MALFUNCTIONS - TM-10-4610-309-140560Table 1. Raw Water System Troubleshooting - TM-10-4610-309-140561Table 1. Raw Water System Troubleshooting - Continued. - TM-10-4610-309-140562Table 1. Raw Water System Troubleshooting - Continued. - TM-10-4610-309-140563DIESEL ENGINE MALFUNCTIONSTable 2. Diesel Engine TroubleshootingTable 2. Diesel Engine Troubleshooting Continued. - TM-10-4610-309-140566MF SYSTEM MALFUNCTIONS - TM-10-4610-309-140567Table 3. MF Feed Pump P-3 Troubleshooting - TM-10-4610-309-140568Table 3. MF Feed Pump P-3 Troubleshooting Continued. - TM-10-4610-309-140569Table 4. Automatic Valves, Air Solenoid Valves Troubleshooting. - TM-10-4610-309-140570Table 5. General MF System Troubleshooting. - TM-10-4610-309-140571Table 5. General MF System Troubleshooting Continued. - TM-10-4610-309-140572Table 6. Feed Flow Control Panel Troubleshooting. - TM-10-4610-309-140573RO SYSTEM MALFUNCTIONS - TM-10-4610-309-140574Table 7. General RO System Troubleshooting - TM-10-4610-309-140575Table 7. General RO System Troubleshooting Continued. - TM-10-4610-309-140576Table 8. High Pressure Pump, Turbocharger Troubleshooting.Table 8. High Pressure Pump, Turbocharger Troubleshooting Continued. - TM-10-4610-309-140578AIR SYSTEM MALFUNCTIONS - TM-10-4610-309-140579Table 9. General Air System Troubleshooting - TM-10-4610-309-140580Table 10. Air Compressor Troubleshooting. - TM-10-4610-309-140581Table 10. Air Compressor Troubleshooting Continued. - TM-10-4610-309-140582CHEMICAL SYSTEM MALFUNCTIONS - TM-10-4610-309-140583Table 11. Chemical System Troubleshooting - TM-10-4610-309-140584PRODUCT WATER SYSTEM MALFUNCTIONS - TM-10-4610-309-140585Table 12. Product Water System Troubleshooting - TM-10-4610-309-140586Table 12. Product Water System Troubleshooting Continued. - TM-10-4610-309-140587COLD WEATHER SYSTEM MALFUNCTIONS - TM-10-4610-309-140588Table 13. Cold Weather System Troubleshooting.Table 13. Cold Weather System Troubleshooting - Continued.UNIT TROUBLESHOOTING PROCEDURES TACTICAL WATER PURIFICATION SYSTEM (TWPS)RAW WATER SYSTEM MALFUNCTIONS - TM-10-4610-309-140592Table 1. Raw Water System Troubleshooting - TM-10-4610-309-140593Table 1. Raw Water System Troubleshooting - Continued. - TM-10-4610-309-140594Table 1. Raw Water System Troubleshooting - Continued. - TM-10-4610-309-140595Table 1. Raw Water System Troubleshooting - Continued. - TM-10-4610-309-140596Table 2. Diesel Engine Troubleshooting.Table 2. Diesel Engine Troubleshooting Continued. - TM-10-4610-309-140598Table 2. Diesel Engine Troubleshooting Continued. - TM-10-4610-309-140599MF SYSTEM MALFUNCTIONS - TM-10-4610-309-140600Table 3. MF Feed Pump P-3 Troubleshooting - TM-10-4610-309-140601Table 3. MF Feed Pump P-3 Troubleshooting Continued. - TM-10-4610-309-140602Table 3. MF Feed Pump P-3 Troubleshooting Continued. - TM-10-4610-309-140603Table 3. MF Feed Pump P-3 Troubleshooting Continued. - TM-10-4610-309-140604Table 4. Automatic Valves, Air Solenoid Valves Troubleshooting. - TM-10-4610-309-140605Table 4. Automatic Valves, Air Solenoid Valves Troubleshooting Continued. - TM-10-4610-309-140606Table 4. Automatic Valves, Air Solenoid Valves Troubleshooting Continued. - TM-10-4610-309-140607Table 5. General MF System Troubleshooting. - TM-10-4610-309-140608Table 5. General MF System Troubleshooting Continued. - TM-10-4610-309-140609Table 6. Feed Flow Control Panel Troubleshooting. - TM-10-4610-309-140610RO SYSTEM MALFUNCTIONS - TM-10-4610-309-140611Table 7. General RO System Troubleshooting - TM-10-4610-309-140612Table 7. General RO System Troubleshooting Continued. - TM-10-4610-309-140613Table 7. General RO System Troubleshooting Continued. - TM-10-4610-309-140614Table 7. General RO System Troubleshooting Continued. - TM-10-4610-309-140615HIGH PRESSURE PUMP AND TURBOCHARGER MALFUNCTIONSTable 8. High Pressure Pump, Turbocharger TroubleshootingTable 8. High Pressure Pump, Turbocharger Troubleshooting Continued. - TM-10-4610-309-140618Table 8. High Pressure Pump, Turbocharger Troubleshooting Continued. - TM-10-4610-309-140619AIR SYSTEM MALFUNCTIONS - TM-10-4610-309-140620Table 9. General Air System Troubleshooting - TM-10-4610-309-140621Table 9. General Air System Troubleshooting - Continued.Table 10. Air Compressor Troubleshooting. - TM-10-4610-309-140623Table 10. Air Compressor Troubleshooting Continued. - TM-10-4610-309-140624Table 10. Air Compressor Troubleshooting Continued. - TM-10-4610-309-140625CHEMICAL SYSTEM MALFUNCTIONS - TM-10-4610-309-140626Table 11. Chemical System Troubleshooting - TM-10-4610-309-140627Table 11. Chemical System Troubleshooting Continued. - TM-10-4610-309-140628Table 11. Chemical System Troubleshooting Continued. - TM-10-4610-309-140629PRODUCT WATER SYSTEM MALFUNCTIONS - TM-10-4610-309-140630Table 12. Product Water System Troubleshooting - TM-10-4610-309-140631Table 12. Product Water System Troubleshooting Continued. - TM-10-4610-309-140632Table 12. Product Water System Troubleshooting Continued. - TM-10-4610-309-140633COLD WEATHER SYSTEM MALFUNCTIONS - TM-10-4610-309-140634Table 13. Cold Weather System TroubleshootingTable 13. Cold Weather System Troubleshooting Continued. - TM-10-4610-309-140636Table 13. Cold Weather System Troubleshooting Continued. - TM-10-4610-309-140637Table 13. Cold Weather System Troubleshooting Continued. - TM-10-4610-309-140638Table 13. Cold Weather System Troubleshooting Continued. - TM-10-4610-309-140639UNIT TROUBLESHOOTING - TWPS CONTROL SYSTEMSPLC AND POWER SUPPLY MALFUNCTIONSTable 1. PLC Processor and Power Supply TroubleshootingOCP DISPLAY AND INSTRUMENT LOOP MALFUNCTIONSTable 2. OCP Display and Instrument Loop TroubleshootingTable 2. OCP Display and Instrument Loop Troubleshooting - Continued. - TM-10-4610-309-140646Table 2. OCP Display and Instrument Loop Troubleshooting - Continued. - TM-10-4610-309-140647Table 2. OCP Display and Instrument Loop Troubleshooting - Continued. - TM-10-4610-309-140648Table 2. OCP Display and Instrument Loop Troubleshooting - Continued. - TM-10-4610-309-140649Table 2. OCP Display and Instrument Loop Troubleshooting - Continued. - TM-10-4610-309-140650Table 2. OCP Display and Instrument Loop Troubleshooting - Continued. - TM-10-4610-309-140651Table 2. OCP Display and Instrument Loop Troubleshooting - Continued. - TM-10-4610-309-140652Table 2. OCP Display and Instrument Loop Troubleshooting - Continued. - TM-10-4610-309-140653Table 2. OCP Display and Instrument Loop Troubleshooting - Continued. - TM-10-4610-309-140654Table 2. OCP Display and Instrument Loop Troubleshooting - Continued. - TM-10-4610-309-140655OCP MISCELLANEOUS CONTROL MALFUNCTIONSTable 3. OCP Miscellaneous Control TroubleshootingTable 3. OCP Miscellaneous Control Troubleshooting Continued.SERVICE UPON RECEIPT - TM-10-4610-309-140659CHECK UNPACKED EQUIPMENTRO ELEMENT SIMULATORS REPLACEMENTRemove the following piping - TM-10-4610-309-140662Figure 1. Parts to Remove in Order to Remove RO Element Simulators.Figure 2. RO Vessel End Cap Removal.Figure 3. RO Element Simulator Removal.Figure 4. Direction of Flow Through RO Vessels.Figure 5. RO Element Installation.Figure 6. RO Vessel End Cap and Retaining Ring Installation.Reinstall the following piping - TM-10-4610-309-140669KNOT CAC ROPESPREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - TM-10-4610-309-140671GENERAL INSPECTION AND MAINTENANCE - TM-10-4610-309-140672Table 1. Preventive Maintenance Checks and Services (PMCS).Table 1. Preventive Maintenance Checks and Services (PMCS). (cont) - TM-10-4610-309-140674Table 1. Preventive Maintenance Checks and Services (PMCS). (cont) - TM-10-4610-309-140675Table 1. Preventive Maintenance Checks and Services (PMCS). (cont) - TM-10-4610-309-140676Table 1. Preventive Maintenance Checks and Services (PMCS). (cont) - TM-10-4610-309-140677Table 1. Preventive Maintenance Checks and Services (PMCS). (cont) - TM-10-4610-309-140678Table 2. Periodic PMCS for TWPS.Table 2. Periodic PMCS for TWPS - Continued. - TM-10-4610-309-140680Table 2. Periodic PMCS for TWPS - Continued. - TM-10-4610-309-140681Table 2. Periodic PMCS for TWPS - Continued. - TM-10-4610-309-140682RAW WATER SYSTEM - TM-10-4610-309-140683MICRO-FILTRATION SYSTEM - TM-10-4610-309-140685Figure 1. MF Module Sleeve and Upper Clip Removal.Figure 2. MF Module Sleeve and Lower Clip Removal.Figure 3. MF Submodule Components.Install the submodule into the MF assemblyOperational checkMF Feed Tank Bag Strainer S-1 CleaningBasket Strainer S-2 CleaningClean the strainer basketREVERSE OSMOSIS SYSTEM - TM-10-4610-309-140695INLINE RO STRAINER S-4 CLEANINGRO FEED PRESSURE TRANSMITTER PT-201 REPLACEMENTFigure 3. RO Feed Pressure Transmitter PT-201 Replacement.RO VESSELS INSPECTIONReplace an RO ElementFigure 4. Parts to Remove in Order to Remove RO Simulators.Figure 5. RO Vessel End Cap Removal.Remove the RO elements from the vessel - TM-10-4610-309-140703Figure 6. RO Element Removal.Clean and inspect the inside of the vessel - TM-10-4610-309-140705Figure 7. RO Element Installation.Figure 8. RO Vessel End Cap and Retaining Ring Installation.Reinstall the following piping - TM-10-4610-309-140708RO ELEMENT SIMULATOR INSTALLATIONFigure 9. RO Element Simulator Installation.RO VESSEL REPAIRRemove the following piping - TM-10-4610-309-140712Figure 10. Parts to Remove in Order to Remove RO Elements.Figure 11. RO Vessel End Cap Removal.Remove the RO elements from the vessel - TM-10-4610-309-140715Figure 12. RO Element Removal.Clean and inspect the inside of the vessel - TM-10-4610-309-140717Figure 13. Element O-Ring Replacement.Assemble the end capReinstall the elementsFigure 14. RO Element Installation.Figure 15. RO Vessel End Cap and Retaining Ring Installation.Reinstall the following piping - TM-10-4610-309-140723MAIN PRESSURE CONTROL VALVE HCV-401 CALIBRATIONAIR SYSTEM - TM-10-4610-309-140725ENTIRE AIR SYSTEM BLEED DOWN PROCEDURES - TM-10-4610-309-140726Compressor Intake Filter Element AF-1 ReplacementAF-2 Purifier Filter Cartridge ReplacementFigure 4. AF2 Purifier Cartridge Replacement.Pressure Switch Assembly PSL/PSH-901 AdjustmentFigure 5. Pressure Switch PSL/PSH-901 Adjustment.Pressure Regulating Valve PRV-901 and PRV-902 AdjustmentBleed the Lubrication System (Vent the Oil Pump) - TM-10-4610-309-140733Figure 8. Air Compressor Oil Pump Supply Tubing and Flywheel.Compressor Belt Tension CheckCONTROL INSTRUMENTS - TM-10-4610-309-140737Figure 1. Transmitter Keypad.PANEL MOUNTED FLOW TRANSMITTER FT-101, FT-401, FT-501 CONFIGURATIONConfiguring the Analog Output - TM-10-4610-309-140740PANEL MOUNTED PRODUCT CONDUCTIVITY TRANSMITTER CIT-501 CONFIGURATIONFigure 2. CIT-501 Conductivity RO Product Measure Screen Standard Configuration.PANEL MOUNTED PRODUCT CONDUCTIVITY TRANSMITTER CIT-501 CONFIGURATION (cont) - TM-10-4610-309-140743PANEL MOUNTED PRODUCT CONDUCTIVITY TRANSMITTER CIT-501 CONFIGURATION (cont) - TM-10-4610-309-140744PANEL MOUNTED PRODUCT CONDUCTIVITY TRANSMITTER CIT-501 CONFIGURATION (cont) - TM-10-4610-309-140745PANEL MOUNTED PRODUCT CONDUCTIVITY TRANSMITTER CIT-501 CALIBRATIONCOLD WEATHER SYSTEM - TM-10-4610-309-140747Hose Heating Blankets ReplacementDiesel Heater Fan Blade ServiceDiesel Heater Spark Plug ServiceDiesel Heater Photocell ServiceFigure 4. Diesel Heater Photocell Removal for Cleaning.GENERAL MAINTENANCE - TM-10-4610-309-140753Push-On Hose Replacement - TM-10-4610-309-140754Tube Fitting-Connected Tube Replacement - TM-10-4610-309-140755Grooved Couplings ReplacementPipe Coupling Replacement - TM-10-4610-309-140757Sanitary Clamp and Gasket ReplacementSolenoid Coil Replacement - TM-10-4610-309-140759Figure 7. Solenoid Coil Replacement.Antiseize Pipe Tape Installation - TM-10-4610-309-140761PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - TM-10-4610-309-140763GENERAL INSPECTION AND MAINTENANCE - TM-10-4610-309-140764Table 1. Periodic PMCS for TWPS.Table 1. Periodic PMCS for TWPS - Continued.RAW WATER SYSTEM - TM-10-4610-309-140767Floating Inlet Strainer, Anchor, Pulley and Rope System ReplacementFigure 1. Raw Water Pump P-1 Skid Fuel Tank Assembly Removal.Figure 3. Raw Water Pump P-1 Engine Mounting Hardware Removal.P-1 Skid Junction Box ReplacementP-1 Diesel Engine-Driven Pump ReplacementP-1 Diesel Engine-Driven Pump Replacement (cont)P-2 Skid Frame ReplacementP-2 Skid Junction Box ReplacementP-2 Electric Motor-Driven Pump ReplacementFigure 8. P-2 Pump and Motor Removal.P-2 Pump Motor ReplacementFigure 9. Pump P-2 Electric Motor Replacement.Figure 10. Drive Sleeve, Impeller, and Seal Assembly.Adaptor Assembly A-01 Repair / ReplacementAdaptor Assembly A-02 Repair / ReplacementCyclone Separator Repair / ReplacementFigure 12. Raw Water Pump P-1 Skid Fuel Tank Assembly Removal.Figure 13. P-1 and P-2 Pump, Adapter, and Wear Plate Removal.Figure 14. P1/P2 Pump Assembly.Figure 15. Pump P-2 Adapter and Pump Installation.Figure 16. Pump Impeller Clearance Adjustment.Inlet Flapper or Outlet Flange Gasket Replacement - TM-10-4610-309-140789OCEAN INTAKE STRUCTURE SYSTEM (OISS)Figure 1. Ocean Intake Structure System (OISS) Components.DIESEL ENGINE AND FUEL TANK ASSEMBLYDiesel Engine ReplacementFigure 1. Diesel Engine Fuel Tank Assembly Removal.Figure 4. Removal of Diesel Engine from Skid.Figure 5. Pump Removal.Set the gap between the impeller and the pump wear plateFigure 6. Impeller Clearance Adjustment.Air Cleaner Assembly ReplacementAir Heater Assembly ReplacementElectric Starter Assembly ReplacementMuffler Assembly Replacement - TM-10-4610-309-140803Fuel Injection Pump ReplacementFigure 12. Diesel Engine Fuel System Bleed.Fuel Injection Valve ReplacementFigure 13. Fuel Injection Valve Replacement.Fuel Line Assemblies ReplacementFuel Tank ReplacementFigure 15. Fuel Tank Assembly Components.Fuel Cock ReplacementEngine Oil and Oil Filter ReplacementRecoil Starter ReplacementFuel Injection Valve ServiceIntake and Exhaust Valve Clearance AdjustmentFigure 20. Setting the Crankshaft to Top Dead Center.Oil Level ServiceMICRO-FILTRATION SYSTEM - TM-10-4610-309-140819Basket Strainer S-2 ReplacementP-3 Skid Frame ReplacementP-3 Skid Junction Box ReplacementMF Feed Pump P-3 Electric Motor Cable ReplacementMF Feed Pump P-3 Pump/Motor Assembly ReplacementMF Feed Pump P-3 Electric Motor ReplacementFigure 5. MF Feed Pump Removal.Solenoid Valve Manifold Assembly ReplacementFigure 8. Solenoid Valve Manifold Assembly Removal.Figure 9. Air Manifold Assembly Air Tube Connection Arrangement.Solenoid Coil Replacement - TM-10-4610-309-140830Solenoid Valve ReplacementWaste Outlet Hoses and Adaptor A-09 ReplacementMF Feed Tank T-1 RepairFigure 13. MF Feed Pump Removal.Install a new seal kit (seal, stationary seat, seat gasket, and spring) and shaft sleeve - TM-10-4610-309-140835Figure 15. Seal Kit and Shaft Sleeve Installation.Waste Out Rupture Disk RD-401 Repair - TM-10-4610-309-140837REVERSE OSMOSIS SYSTEM - TM-10-4610-309-140839RO FEED TANK PUMP INLET STRAINER S-3 REPLACEMENTRO Feed Tank Heaters H-1 and H-2 ReplacementFigure 2. RO Feed Tank Heater Replacement.RO Feed Pump P-4 Pump/Motor Assembly ReplacementFigure 3. RO Feed Pump P4 Assembly Removal.RO Feed Pump P-4 Drain Valve V-211 ReplacementRO Feed Pump P-4 Electric Motor ReplacementInline RO Strainer S-4 ReplacementFigure 6. Inline RO Strainer S-4 Replacement.HP Pump Relief Valve RV-301 and RO Feed Relief Valve RV-302 ReplacementRO Product Flow Three-Way Valves V-501 through V-510 ReplacementProduct Relief Valve RV-501 ReplacementProduct Vacuum Breaker VB-501 ReplacementProduct Check Valve V-512 ReplacementMain and Auxiliary Pressure Control Valves HCV-401 and HCV-401A ReplacementPressure Recovery Turbocharger PRT-1 ReplacementFigure 13. Removal of Pressure Recovery Turbocharger PRT-1 from the TWPS.Figure 14. Removal of Pressure Recovery Turbocharger PRT-1 from Its Base Plate.Turbocharger Feed Drain Valve V-303 and Reject Drain Valve V-410 ReplacementFigure 15. Turbocharger Feed or Reject Drain Valve V-303 / V-410 Replacement.Reject Backflow Check Valve V-411 ReplacementWaste Out Hose and Adaptor A-09 ReplacementWaste Out Rupture Disk RD-401 Repair - TM-10-4610-309-140862RO Feed Tank Cover Hinge RepairRO Feed Pump P-4 RepairFigure 20. RO Feed Pump Removal.Install a new seal kit (seal, stationary seat, seat gasket, and spring) and shaft sleeve - TM-10-4610-309-140866Figure 22. RO Feed Pump Installation.Pressure Recovery Turbocharger PRT-1 RepairFigure 25. Pressure Recovery Turbocharger PRT-1.Replace the thrust bearingHIGH PRESSURE PUMPSFigure 1. High Pressure Pump Assembly Removal.Install the high pressure pump assembly in the TWPSHigh Pressure Pump or Motor ReplacementFigure 3. High Pressure Pump Coupling Removal1000-Hour High Pressure Pump PMCSFigure 4. High Pressure Pump Manifold Removal.Figure 6. Piston Body Removal.Figure 8. Piston Cluster Installation.Figure 9. Piston Body Inspection.Figure 11. Disk Check Valve Replacement.Figure 12. Valve Housing Assembly Installation.2000 Hour High-Pressure Pump PMCSFigure 15. High Pressure Pump Spacer Removal.Figure 16. HPP Cam Removal.Figure 18. HPP Shaft Seal and Mounting Flange Removal and Installation.Figure 19. Thrust Bearing and Spacer Installation.Figure 20. HPP Cam Inspection and Installation.High Pressure Pump RepairFigure 21. High Pressure Pump Shaft Seal RemovalFigure 22. Cam Cleaning and Inspection.Figure 24. Bearing Plate Bearing Removal.Figure 25. Bearing Plate Bearing Installation.Figure 26. Bearing Plate and Thrust Bearing Setup.Figure 28. Piston Cluster Installation.Figure 29. Thrust Bearing and Spacer Installation.Figure 30. Piston Cylinder Liner Removal.Figure 31. High Pressure Pump Body Bearing Removal.Figure 32. High Pressure Pump Body Bearing Installation.Figure 34. Piston Inspection.Figure 35. High Pressure Pump Piston Installation.Figure 37. HPP Manifold Inspection.Figure 38. High Pressure Pump Manifold Installation.Check for leaks and proper high pressure pump operation.AIR SYSTEM, HIGH PRESSUREHIGH-PRESSURE AIR SYSTEM BLEED DOWN PROCEDURESENTIRE AIR SYSTEM BLEED DOWN PROCEDURES - TM-10-4610-309-140907Replace oil/water coalescer CO1Figure 3. Oil/Water Coalescer CO1.Purification Filter Assembly AF2 ReplacementPressure Switch Assembly PSL/PSH-901 ReplacementFigure 5. Pressure Switch Assembly PSL/PSH-901 Replacement.Air System Section 1 Assembly ReplacementFigure 6. Air System Section 1 Assembly.Pressure Maintaining Valve V-905 ReplacementLow Pressure Air Check Valve V-906 ReplacementFigure 8. Low-Pressure Check Valve V-906.Pressure Gauge PI-901 ReplacementAir Receiver Tank R-1 Replacement ReplacementFigure 10. Low and High Pressure Air System Bleed Down.Figure 12. High Pressure Pump Outlet Pipe Spool Removal.Remove the waste out pipe spool from in front of the air receiver tankFigure 13. Waste Out Pipe Spool and Air Receiver Tank Removal.Install the new air receiver tankFigure 14. Waste Out Pipe Spool Installation.Figure 15. High Pressure Pump Outlet Pipe Spool Installation.Pressure Regulating Valve PRV-901 ReplacementFigure 17. Pressure Regulator Valve PRV-901.Pressure Gauge PI-902 ReplacementRelief Valve RV-902 ReplacementFigure 19. Relief Valve RV-902.CO1 Oil/Water Coalescer Sintered Metal Filter ServiceFigure 20. Coalescer CO1 Sintered Metal Filter.AIR SYSTEM, REDUCED PRESSUREENTIRE AIR SYSTEM BLEED DOWN PROCEDURES - TM-10-4610-309-140936Air System Section 3 Assembly ReplacementFigure 2. Air System Section 3 Assembly.Solenoid Valve XV-901 ReplacementPressure Regulating Valve PRV-902 ReplacementFigure 4. Pressure Regulating Valve PRV-902.Pressure Gauge PI-903, 0-30 psig ReplacementSolenoid Valve XV-903 ReplacementFigure 6. Solenoid Valve XV-903.Air System Section 4 Assembly ReplacementSolenoid Valve XV-902 ReplacementFigure 8. Solenoid Valve XV-902.Check Valve V-908 ReplacementAir System Section 6 Assembly ReplacementFigure 10. Air System Section 6 Assembly.Oil/Water Coalescer CO2 ReplacementManifold Maintenance Shutoff Valve V-909 ReplacementFigure 12. Shutoff Valve V-909.Vent Valve V-910 ReplacementAir System Air Hose Assemblies ReplacementAIR COMPRESSOR - TM-10-4610-309-140957Drive Motor ReplacementFigure 1. Compressor Drive Belt Guard and Drive Belt Removal.Figure 2. Drive Motor Removal.Oil Pressure Regulator ReplacementFigure 4. Oil Pressure Regulator Adjustment.High Pressure Air System Bleed Down ProceduresAir Compressor ReplacementFigure 6. Air Compressor Removal.Oil Pump ReplacementFigure 7. Oil Pump Replacement.First Stage Valve Head Assembly ReplacementFigure 8. First Stage Valve Head Assembly Replacement.Second Stage Valve Head Assembly ReplacementFigure 9. Second Stage Valve Head Assembly Replacement.Figure 10. Second Stage Valve Head Cap Screw Torque Sequence.Third Stage Valve Head Assembly Replacement:Figure 11. Third Stage Valve Head Assembly Replacement.Figure 12. Third Stage Valve Head Cap Screw Torque Sequence.Temperature Switch ReplacementCompressor Drive Belt ReplacementCompressor Belt Tension AdjustmentFigure 15. Compressor Belt Tension Adjustment.Intermediate Filter ServiceCompressor Oil ChangeFigure 17. Compressor Oil Change.Bleed the Lubrication System (Vent the Oil Pump) - TM-10-4610-309-140983Figure 19. Air Compressor Oil Pump Supply Tubing and Flywheel.CHEMICAL INJECTION SYSTEM - TM-10-4610-309-140985Figure 1. Chemical Injection Pump.Figure 2. Chemical Pump Relief and Anti-Siphon Knobs.Figure 3. Chemical Pump Replacement.Install the new chemical injection pump onto the TWPSFigure 4. Chemical Injection Pump Control Knobs.Injection Check Valve Assembly Replacement (V-613, V-623, V-633)Figure 6. Injection Check Valve Assembly Replacement.Foot Valve Assembly Replacement (V-611, V-621 and V-631)Chemical Injection Pump Repair / Four-Function Valve (V-612, V-622 and V-632)Figure 8. Chemical Injection Pump Four-Function Valve Replacement.Chemical Injection Pump Repair / Pump Head AssemblyChemical Injection Pump Repair / Pump DiaphragmFigure 11. Pump Diaphragm Removed from Pump Head Spacer.Chemical Injection Pump Repair / Discharge Cartridge Valve, O-Ring, and Flat WasherChemical Injection Pump Repair / Suction Valve AssemblyFigure 14. Chemical Injection Pump Suction Valve Assembly Replacement.PRODUCT WATER DISTRIBUTION SYSTEMP-7 Skid Frame ReplacementP-7 Skid Junction Box ReplacementP-7 Skid Power Cable ReplacementP-7 Pump ReplacementFigure 3. P-7 Pump and Motor Removal.P-7 Pump Motor ReplacementFigure 4. Pump P-7 Electric Motor Replacement.Figure 5. Drive Sleeve, Impeller, and Seal Assembly.Product Water Distribution Hose Repair / ReplacementP-7 and P-8 Pump Overhaul - TM-10-4610-309-141013P-7 and P-8 Pump Overhaul - TM-10-4610-309-141014Figure 7. Extended Distribution Pump P-8 Skid Fuel Tank Assembly Removal.Figure 8. P-8 and P-7 Pump, Adapter, and Wear Plate Removal.Figure 9. P7/P8 Pump Assembly.Figure 10. Pump P-7 Adapter and Pump Installation.Figure 11. Pump Impeller Clearance Adjustment.Inlet Flapper or Outlet Flange Gasket Replacement - TM-10-4610-309-141020OPERATING CONTROL SYSTEM TOP PANELFigure 1. Opening the OCP Instrument Panel.Light Bulb ReplacementPilot Light ReplacementHour Meter ReplacementDigital Display ReplacementFigure 6. Digital Display Replacement.Figure 7.Digital Display SettingsRotary Switch ReplacementPush Button ReplacementFigure 9. Push Button Replacement.Selector Switch ReplacementEmergency Stop Push Button ReplacementFigure 11. Emergency Stop Button Replacement.Alarm Horn Replacement10-Turn Potentiometer Replacement1000 Ohm Potentiometer ReplacementFigure 14. 1000 Ohm Potentiometer Assembly Replacement.Computer Cable Assembly ReplacementFigure 15. Computer Cable Assembly Replacement.OPERATING CONTROL SYSTEM SUB PANEL13-Slot Chassis Power Supply ReplacementFigure 2. 13-Slot Chassis Power Supply Removal.PLC Processor Module and Memory Module ReplacementFigure 3. PLC Processor Module and Memory Module Replacement.AC Input Module, Relay Output Module, or Triac Output Module ReplacementAnalog Output Module ReplacementFigure 5. Analog Output Module Replacement.Analog Input Module ReplacementFigure 6. Analog Input Module Replacement.13-Slot Chassis ReplacementFigure 9. 13-Slot Chassis Replacement.3-Pole Relay ReplacementTime Delay Relay ReplacementPower Line Filter ReplacementElectric Heater ReplacementSolid State Relay ReplacementCircuit Breaker Replacement - TM-10-4610-309-141058Figure 15. Circuit Breaker Removal.Instrumentation Power Supply ReplacementAC or DC Terminal ReplacementGround Terminal ReplacementFigure 18. Ground Terminal Removal.FEED FLOW CONTROL PANEL - TM-10-4610-309-141065AIR SYSTEM BLEED DOWN PROCEDURESFeed Flow Control Panel Assembly ReplacementFigure 2. Feed Flow Control Panel Removal.Pressure Regulating Valve PRV-904 ReplacementFigure 3. Pressure Regulating Valve PRV-904.IP Transducer FY-102 ReplacementFigure 4. IP Transducer FY-102.Three-Way Solenoid Valve XV-912 ReplacementFigure 5. Three Way Solenoid Valve XV-912.Feed Control Selector Valve V-914 ReplacementFigure 6. Feed Control Selector Valve V-914.Pressure Gauge 0-30 psig PI-904 ReplacementFigure 7. Pressure Gauge PI-904.CONTROL INSTRUMENTS - TM-10-4610-309-141079Conductivity Sensor Replacement - TM-10-4610-309-141080Panel-Mounted Flow Transmitter ReplacementFigure 2. Flow Transmitter Wiring Terminal Designations.Panel-Mounted Flow Transmitter ConfigurationConfigure a flow transmitter with its sensorConfiguring the Analog Output - TM-10-4610-309-141085Tee-Mounted Flow Sensor ReplacementFigure 4. Tee-Mounted Flow Sensors.Figure 5. Flow Sensor and Instrument/Solenoid Panel Box Location.Flow Loop Status CheckFigure 6. Panel-Mounted Conductivity Transmitter Removal.Panel-Mounted Conductivity Transmitter ConfigurationFigure 7. CIT-501 Conductivity RO Product Measure Screen Standard Configuration.Panel-Mounted Conductivity Transmitter Configuration (cont) - TM-10-4610-309-141093Panel-Mounted Conductivity Transmitter Configuration (cont) - TM-10-4610-309-141094Conductivity Sensor Replacement - TM-10-4610-309-141095Figure 8. Conductivity Sensors Location.Figure 9. Conductivity Sensors and Instrument/Solenoid Panel Box Location.Figure 10. Conductivity Sensor Wiring Connections to the Conductivity Transmitter.MF and RO System Indicator ReplacementFigure 11. Location and Position of MF and RO System Indicators.MF and RO System Transmitter ReplacementFigure 12. Location of MF and RO System Transmitters.POWER DISTRIBUTION SYSTEMCircuit Breaker with Auxiliary Switch ReplacementFigure 1. Circuit Breaker with Auxiliary Switch Replacement.Circuit Breaker Replacement - TM-10-4610-309-141106GFI Module ReplacementFigure 3. GFI Module Replacement.Contactor/Overload Relay / Surge Suppressor ReplacementFigure 4. Contactor/Overload Relay/Surge Suppressor Assembly Replacement.Contactor/ Surge Suppressor ReplacementFigure 5. Contactor/Surge Suppressor Replacement.Surge Arrester ReplacementFigure 6. Surge Arrestor Replacement.Surge Arrester Assembly ReplacementFigure 7. Surge Arrester Assembly Replacement.Busbar Jumper ReplacementFigure 8. Busbar Jumper Replacement.Surge Suppressor ReplacementTransformer ReplacementFigure 10. Transformer Replacement.125 Amp Main Power Circuit Breaker ReplacementDistribution Block ReplacementFigure 12. Distribution Block Assembly Replacement.Power Connector ReplacementLight Outlet Assembly ReplacementFigure 14. Light Outlet Assembly RemovalUtility Outlet Assembly ReplacementLight Switch ReplacementFigure 16. Light Switch Replacement.Main Circuit Breaker Handle ReplacementFigure 17. Main Circuit Breaker Handle Replacement.COLD WEATHER SYSTEM - TM-10-4610-309-141133Figure 1. Diesel Heater Burner Head Removal.Figure 2. Diesel Heater Burner Head Nozzle.Diesel Heater Fan ReplacementDiesel Heater Fuel Filter ReplacementFigure 4. Diesel Heater Fuel Filter Removal and Installation.Diesel Heater Motor Relay and Motor Testing/ReplacementFigure 5. Diesel Heater Motor Relay and Motor Test Set-Up.Replace / reinstall the motor starting relayFigure 6. Diesel Heater Motor and Pump Assembly Replacement.Diesel Heater Output Air Filter ReplacementDiesel Heater Overheat Switch Testing/ReplacementDiesel Heater Photocell Testing/ReplacementDiesel Heater Safety Control Assembly Testing/ReplacementFigure 10. Diesel Heater Safety Control Test Set-Up.Figure 11. Diesel Heater Safety Control Assembly Replacement.Figure 12. Diesel Heater Safety Control Wiring Diagram.Check the operation of the safety controlDiesel Heater Spark Plug and Transformer Testing/ReplacementRemove the diesel heater spark plugFigure 14. Diesel Heater Spark Plug / Transformer Test Set-Up.Figure 15. Transformer Replacement.General Purpose Transformer Electrical Outlet Assembly or Power Cord ReplacementFigure 17. General Purpose Transformer Cable Removal.Diesel Heater Air Pump Pressure AdjustmentFLAT RACK AND TACTICAL QUIET GENERATORLatch ReplacementSeal ReplacementFigure 4. Flat Rack Flat Seal Replacement.Lowering and Raising the Bail BarFigure 6. Removing the Bolts from the Bail Bar.Figure 7. Flat Rack Bail Bar Lowered.Figure 8. Correct Bail Bar Bolt Installation Locations.GENERAL MAINTENANCE - TM-10-4610-309-141167Clamped-On Hose ReplacementCompression Fitting Connected Hose ReplacementPush-On Hose Replacement - TM-10-4610-309-141170Tube Fitting-Connected Tube Replacement - TM-10-4610-309-141171Welded Ball Valve ReplacementThreaded Ball Valve ReplacementFigure 6. Threaded Ball Valve Replacement.Butterfly Valve ReplacementInstall the new butterfly valve assembly onto the actuatorLimit Stop ReplacementFigure 9. Limit Stop Threaded Stud Installation.Figure 12. Valve V-113 Installation on the Limit Stop.Actuator (with Mechanical Position Indicator) ReplacementActuator (with a Pneumatic Positioner) ReplacementGrooved Coupling ReplacementFlexi Joint Expansion Joint ReplacementPipe Coupling Replacement - TM-10-4610-309-141184Sanitary Clamp ReplacementLocking Arm Assembly ReplacementActuator RepairFigure 20. Actuator Disassembly.Figure 21. Position of Actuator Pinion Shaft Keyways Prior to Installing Pistons.Figure 22. Actuator Spring Assembly.Figure 23. End Cap Assembly.Figure 24. Actuator Travel Stops.Collapsible Fabric Tank RepairAntiseize Pipe Tape Installation - TM-10-4610-309-141194WIRING DIAGRAMS - TM-10-4610-309-141195DIESEL ENGINE - TM-10-4610-309-141197CYLINDER HEAD MAINTENANCEFigure 1. Cylinder Head Removal.Intake and Exhaust Valve RemovalCleaning, Inspection, and ReplacementReassembly - TM-10-4610-309-141202Figure 5. Cylinder Head Installation.PISTON RING REPLACEMENTFigure 7. Camshaft, Valve and Fuel Oil Tappets, and Balancer Shaft Removal.Figure 8. Piston and Connecting Rod Assembly Removal.Figure 9. Piston Ring Removal.Figure 10. Crankshaft, Camshaft, and Balancer Shaft Timing Marks.Figure 11. Crankcase Cover Bolt Tightening Sequence.MICRO-FILTRATION SYSTEM - TM-10-4610-309-141211MF Assembly RemovalFigure 2. MF Backwash Component Removal from the MF Assembly.Figure 3. MF Filtrate Valve and Pipe Section Removal.Figure 4. A-TWPS Vertical Flat Rack Brace Removal.Figure 5. Temporary Bracing for MF Assembly Removal.Figure 6. TWPS MF Assembly Removal.MF Assembly Disassembly and RepairMF Assembly ReassemblyMF Assembly InstallationREVERSE OSMOSIS SYSTEM - TM-10-4610-309-141221RO Feed Tank ReplacementFigure 2. RO Feed Tank Front and Bottom Connections Removal.Figure 3. MF-Filtrate-to-RO Feed Tank Pipe Section Removal.Figure 4. Upper MF Backwash Pipe Section Removal.Figure 5. Lower MF Backwash Pipe Section Removal.Figure 6. Heater Cable Removal.Figure 7. RO Feed Tank Drain Pipe Assembly Removal.Figure 8. RO Feed Tank Removal from TWPS Frame.Install a new RO feed tankInstall the MF filtrate pipe section at the right end of the tankRO Vessel ReplacementFigure 9. RO Vessel Replacement.Figure 10. RO Vessel Positioning Dimensions.Install new RO vessel #5, 4, 3, or 2TACTICAL WATER PURIFICATION SYSTEM (TWPS) SKID, FLAT RACK, AND TACTICAL QUIET GENERATOR (TQG)Remove the TWPS Unit from the flat rackFigure 1. A-TWPS Removal from the Flat Rack.TQG Replacement (A-TWPS Only)Figure 2. TQG Removal from the Flat Rack.Frame, Tie-Down, and Lift Provision RepairCOLD WEATHER SYSTEM - TM-10-4610-309-141243Figure 2. Adaptor A-02 Heating Blanket.Figure 5. General Purpose Cover (MC-TWPS).GENERAL DIRECT SUPPORT MAINTENANCE PROCEDURESFigure 1. Cable Connector Replacement.Prepare the cable for installation onto the new connectorAssemble the new connectorREFERENCES - TM-10-4610-309-141251MISCELLANEOUSMAINTENANCE ALLOCATION CHART (MAC) - TM-10-4610-309-141253Maintenance Functions - TM-10-4610-309-141254Explanation of Columns in the MAC - TM-10-4610-309-141255Explanation of Columns in the Tools and Test Equipment Requirements - TM-10-4610-309-141256Table 1. MAC for TWPS.Table 1. MAC for TWPS. (cont) - TM-10-4610-309-141258Table 1. MAC for TWPS. (cont) - TM-10-4610-309-141259Table 1. MAC for TWPS. (cont) - TM-10-4610-309-141260Table 1. MAC for TWPS. (cont) - TM-10-4610-309-141261Table 1. MAC for TWPS. (cont) - TM-10-4610-309-141262Table 2. Tools and Test Equipment for TWPS.Table 3. Remarks for TWPS.COMPONENTS OF END ITEM (COEI) AND BASIC ISSUE ITEMS (BII) - ARMYTable 1. Components of End Item List. - TM-10-4610-309-141266Table 1. Components of End Item List Continued. - TM-10-4610-309-141267Table 1. Components of End Item List Continued. - TM-10-4610-309-141268Table 1. Components of End Item List Continued. - TM-10-4610-309-141269Table 1. Components of End Item List Continued. - TM-10-4610-309-141270Table 1. Components of End Item List Continued. - TM-10-4610-309-141271Table 1. Components of End Item List Continued. - TM-10-4610-309-141272Table 1. Components of End Item List Continued. - TM-10-4610-309-141273Table 1. Components of End Item List Continued. - TM-10-4610-309-141274Table 1. Components of End Item List Continued. - TM-10-4610-309-141275Table 1. Components of End Item List Continued. - TM-10-4610-309-141276Table 1. Components of End Item List Continued. - TM-10-4610-309-141277Table 1. Components of End Item List Continued. - TM-10-4610-309-141278Table 2. Basic Issue Items List. - TM-10-4610-309-141279Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141280Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141281Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141282Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141283Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141284Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141285Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141286Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141287Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141288Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141289Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141290Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141291Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141292Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141293Table 2. Basic Issue Items List. Continued. - TM-10-4610-309-141294COMPONENT OF END ITEM (COEI) AND BASIC ISSUE ITEMS (BII) - MARINE CORPSTable 1. Components of End Item List. - TM-10-4610-309-141296Table 1. Components of End Item List Continued. - TM-10-4610-309-141297Table 1. Components of End Item List Continued. - TM-10-4610-309-141298Table 1. Components of End Item List Continued. - TM-10-4610-309-141299Table 1. Components of End Item List Continued. - TM-10-4610-309-141300Table 1. Components of End Item List Continued. - TM-10-4610-309-141301Table 1. Components of End Item List Continued. - TM-10-4610-309-141302Table 1. Components of End Item List Continued. - TM-10-4610-309-141303Table 2. Basic Issue Items List. - TM-10-4610-309-141304Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141305Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141306Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141307Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141308Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141309Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141310Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141311Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141312Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141313Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141314Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141315Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141316Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141317Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141318Table 2. Basic Issue Items List - Continued. - TM-10-4610-309-141319COMPONENTS OF END ITEM (COEI) AND BASIC ISSUE ITEMS (BII) - MARINE CORPS EXTENDED CAPABILITY KITSTable 1. Cold Weather Kit.Table 1. Cold Weather Kit Continued. - TM-10-4610-309-141323Table 1. Cold Weather Kit Continued. - TM-10-4610-309-141324Table 1. Cold Weather Kit Continued. - TM-10-4610-309-141325Table 1. Cold Weather Kit Continued. - TM-10-4610-309-141326Table 2. Cleaning Waste Storage Kit.Table 3. Ocean Intake Structure System.Table 3. Ocean Intake Structure System Continued.Table 4. NBC Water Treatment Kit.Table 5. NBC Survivability Kit.EXPENDABLE AND DURABLE ITEMS LIST - TM-10-4610-309-141333Table 1. Expendable and Durable Items List. - TM-10-4610-309-141334Table 1. Expendable and Durable Items List. Continued. - TM-10-4610-309-141335Table 1. Expendable and Durable Items List. Continued. - TM-10-4610-309-141336OPERATING DATA LOGOPERATING DATA LOG (Cont)OPERATOR MAINTENANCE LOGTWPS OPERATOR MAINTENANCE LOGTWPS OPERATOR MAINTENANCE LOG (cont) - TM-10-4610-309-141344TWPS OPERATOR MAINTENANCE LOG (cont) - TM-10-4610-309-141345TWPS OPERATOR MAINTENANCE LOG (cont) - TM-10-4610-309-141346TWPS OPERATOR MAINTENANCE LOG (cont) - TM-10-4610-309-141347TWPS OPERATOR MAINTENANCE LOG (cont) - TM-10-4610-309-141348TWPS OPERATOR MAINTENANCE LOG (cont) - TM-10-4610-309-141349REVERSE OSMOSIS ELEMENT PERFORMANCE LOGRO ELEMENT PERFORMANCE LOGREVERSE OSMOSIS % CLEAN CALCULATION - TM-10-4610-309-141355REVERSE OSMOSIS % CLEAN CALCULATION - TM-10-4610-309-141356Table 1. Factor ATable 3. Factor TCF.RO % CLEAN CALCULATIONExampleGLOSSARY - TM-10-4610-309-141363INDEX - TM-10-4610-309-141365INDEX (cont) - TM-10-4610-309-141366INDEX (cont) - TM-10-4610-309-141367INDEX (cont) - TM-10-4610-309-141368INDEX (cont) - TM-10-4610-309-141369INDEX (cont) - TM-10-4610-309-141370INDEX (cont) - TM-10-4610-309-141371INDEX (cont) - TM-10-4610-309-141372INDEX (cont) - TM-10-4610-309-141373INDEX (cont) - TM-10-4610-309-141374INDEX (cont) - TM-10-4610-309-141375INDEX (cont) - TM-10-4610-309-141376INDEX (cont) - TM-10-4610-309-141377INDEX (cont) - TM-10-4610-309-141378INDEX (cont) - TM-10-4610-309-141379INDEX (cont) - TM-10-4610-309-141380INDEX (cont) - TM-10-4610-309-141381SFA, Inc. WARRANTY TERMS AND PROCEDURE for the END-USER of the 1500 TWPSExcluded from WarrantyClaim ProcedureFigure 1. TWPS Schematic Diagrams (Sheet 1 of 8).Figure 1. TWPS Schematic Diagrams (Sheet 2 of 8).Figure 1. TWPS Schematic Diagrams (Sheet 3 of 8).Figure 1. TWPS Schematic Diagrams (Sheet 4 of 8).Figure 1. TWPS Schematic Diagrams (Sheet 5 of 8).Figure 1. TWPS Schematic Diagrams (Sheet 6 of 8).Figure 1. TWPS Schematic Diagrams (Sheet 7 of 8).Figure 1. TWPS Schematic Diagrams (Sheet 8 of 8).Figure 2. TWPS Point-to-Point Wiring Diagrams OCP Front Panel Power (Sheet 1 of 2).Figure 2. TWPS Point-to-Point Wiring Diagrams OCP Front Panel Signal (Sheet 2 of 2).Figure 3. TWPS Point-to-Point Wiring Diagrams OCP Sub-Panel OCP Inputs (Sheet 1 of 5).Figure 3. TWPS Point-to-Point Wiring Diagrams OCP Sub-Panel OCP Outputs (Sheet 2 of 5).Figure 3. TWPS Point-to-Point Wiring Diagrams OCP Sub-Panel OCP to ISP (Sheet 3 of 5).Figure 3. TWPS Point-to-Point Wiring Diagrams OCP Sub-Panel OCP to PDP (Sheet 4 of 5).Figure 3. TWPS Point-to-Point Wiring Diagrams OCP Sub-Panel OCP to OCP Door (Sheet 5 of 5).Figure 4. TWPS Point-to-Point Wiring Diagrams PDP Sub-Panel Power (Sheet 1 of 4).Figure 4. TWPS Point-to-Point Wiring Diagrams PDP Sub-Panel Signal (Sheet 2 of 4).Figure 4. TWPS Point-to-Point Wiring Diagrams PDP Sub-Panel Coil (Sheet 3 of 4).Figure 4. TWPS Point-to-Point Wiring Diagrams PDP Sub-Panel External Power (Sheet 4 of 4).Figure 5. Instrument / Solenoid Sub-Panel OCP Inputs (Sheet 1 of 5).Figure 5. Instrument / Solenoid Sub-Panel OCP Inputs (Sheet 2 of 5).Figure 5. Instrument / Solenoid Sub-Panel OCP Inputs (Sheet 3 of 5).Figure 5. Instrument / Solenoid Sub-Panel OCP Inputs (Sheet 4 of 5).Figure 5. Instrument / Solenoid Sub-Panel Rear View of Panel (Sheet 5 of 5).TM-10-4610-309-14 Tactical Water Purification System (TWPS) Army NSN 4610-01-488-9656 Marine Corps NSN
4610-01-488-6961 Manual