TM 10-6630-222-12&P
OPERATOR AND UNIT MAINTENANCE MANUAL
(INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)
FOR WATER QUALITY ANALYSIS SET: PURIFICATION (WQAS-P)
SUPPORTING INFORMATION
MAINTENANCE ALLOCATION CHART
Table 1. MAC for WQAS-P
(1)
(2)
(3)
(4) MAINTENANCE
(5)
(6)
LEVEL
MAINTENANCE UNIT DS GS DEPOT TOOLS AND
GROUP
COMPONENT/ASSEMBLY
NUMBER
FUNCTION
COF H
D
EQUIPMENT REMARKS
A, B
0.5
Inspect
WATER QUALITY
00
ANALYSIS SET
A
0.1
Inspect
TURBIDITY METER
01
D
0.3
Service
E
0.5
Calibrate
D
0.1
Replace
A
0.1
Inspect
B
0.5
Service
ULTRAMETER
02
E
0.5
Calibrate
D
0.1
Replace
A
0.2
Inspect
PHOTOMETER
03
B
0.3
Service
E
0.5
Calibrate
D
0.1
Replace
CARRYING CASE
04
A
0.3
Inspect
B
0.2
Service
C
1,2
0.5
Replace
Table 2. Tool and Test Equipment for WQAS-P
TOOL OR TEST
MAINTENANCE
NATIONAL
NOMENCLATURE
TOOL NUMBER
EQUIPMENT
LEVEL
STOCK NUMBER
1
O
Tool Kit, General Mechanics
SC-5180-90-CL-N26
2
O
Tool Kit, Common No. 1
SC-4910-95-CL-A74
Table 3. Remarks for WQAS-P
MAINTENANCE ALLOCATION CHART
REMARKS
REMARKS
CODE
External
A
Preventive maintenance checks and services (PMCS)
B
Refernce to tools only for assistance in foam insert removal/replacement.
C
If required by SMR code, send to special repair activity (SRA) for warranty work.
D
Replace chemicals, batteries and supplies as needed. Refer to RPSTL and Expendable and Durable
E
Supplies List
END OF WORK PACKAGE
0021 00-1/2 blank