CHAPTER 2
OPERATING INSTRUCTIONS
Section I. PREVENTIVE MAINTENANCE CHECK AND SERVICES (PMCS)
2-1. Before You Operate. Always keep in mind the WARNINGS, CAUTIONS, and NOTES.
Perform the PMCS in Table 2-1 before operation.
2-2. PMCS Procedures. The PMCS table lists those required checks and services to ensure the
Decon Kit or Training Aid is ready for use. When recording results of PMCS, entries in the PMCS
Item No. column will be used for the TM Item No. column on DA Form 2404.
CAUTION
Be careful not to damage the packets or break the ampoules during your
inspection.
2-1