TM 3-4230-218-30&P
Section II.
DIRECT SUPPORT MAINTENANCE PROCEDURES
2-4.
GENERAL.
This section contains the procedures for maintaining the components which are
the responsibility of Direct Support Maintenance.
ranged as follows:
PARA
2-5
Decontaminating Apparatus
2-6
Gasoline Engine and Fan Assembly
2-7
Centrifugal Fan
2-8
Gasoiline Engine Assembly
2-9
Carburetor
2-10
Starter Assembly
2-11
Heat Exchanger
2-12
Burner Fuel System
2-13
Fluid Filter
2-14
Control Panel
2-15
Frame
These procedures are ar-
PAGE NO.
2-12
2-21
2-26
2-28
2-40
2-43
2-45
2-52
2-58
2-60
2-75
2-5. DECONTAMINATING APPARATUS.
This task consists of:
a.
Repair
INITIAL SETUP:
Tools Required:
Tool Kit, General Mechanics
Extractor, Fan
Socket Set, Metric 8-19mm
Tool Kit from Accessory Kit
Materials Required:
Brush, Varnish (Item 1, Appendix C).
Cleaning Solvent (Item 5, Appendix C).
Locking Compound (Item 2, Appendix C).
Equipment Conditions:
Engine shutdown and cool.
Drive belts removed (TM 3-4230-218-12&P).
Burner fuel pump and belt removed (page 2-56).
2-12