TM 5-3800-205-10-2
AIR TRANSPORT BY C-130 AIRCRAFT - CONTINUED
0017 00
RETURN MACHINE TO OPERATIONAL CONFIGURATION - CONTINUED
17.
Remove load transfer axles and set aside for stowage in ISU-60 container:
a.
Remove two bolts, washers, retainer bar, and pin and remove each load transfer axle from bracket at front corner of
tank.
b.
Remove two bolts, washers, retainer bar, pin, and disconnect rod end of each lift cylinder from load transfer axle.
Reinstall mounting hardware on axle.
NOTE
Work simultaneously on both sides and operate hydraulics to extend or retract cylinders as needed to
align mounting holes.
Clean and lubricate pins with antiseize compound (Item 5, WP 0025 00) before they are installed.
c.
Pivot each cylinder rearward, align mounting holes, and install cylinder to bracket at front corner of tank with
mounting hardware (pin, retainer bar, two washers, and bolts) removed in step a. Tighten bolts securely.
LIFT
CYLINDER
PIN, BOLTS, WASHERS
AND RETAINER BAR
BRACKET
PIN
LOAD
BOLTS, WASHERS, AND
TRANSFER
RETAINER BAR
AXLE
WARNING
Configuration change at front of tank should NEVER be attempted without first securing the tank by block-
ing it so that it is firmly supported. Failure to follow this warning may cause injury to personnel.
18.
Remove cutting edge wheels and set aside for stowage in ISU-60 container:
a.
Start engine and raise tank until approximately 24 in. (61 cm) from the ground. Block tank securely.
b.
With assistance and using a pry bar, loosen two setscrews and remove each cutting edge wheel.
c.
Remove blocks, lower tank, and shut down engine.
0017 00-40