TM 5-4610-233-13&P
CHAPTER 1
INTRODUCTION
Destruction of Army Materiel To
Prevent Enemy Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Equipment Characteristic,
Capabilities, and Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Equipment Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Location and Description of Major
Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Maintenance Forms, Records, and
Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Preparation for Storage or Shipment . . . . . . . . . . . . . . . . . . . . . . . . . . . .
QuaIity Assurance/QuaIity Control
(QA/QC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Reporting Equipment Improvement
Recommendations (EIR) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Safety, Care, and Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Schematic Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Scope . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Warranty Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Para
1-5
1-9
1-11
1-10
1 -2
1-8
1-7
1-3
1-8
1-12
1-1
1-4
Page
1-1
1-2
1-3
1-2
1-1
1-1
1-2
1-1
1-2
1-4
1-1
1-1
Section I. GENERAL INFORMATION
1-1. SCOPE. This manual contains operation and maintenance instructions for Water Purification
Hypochlorination Unit Model 1955-3 (figure 1-1), hereinafter called hypochlorination unit. This manual includes
procedures for operation, cleaning, inspection, testing, servicing, disassembly, and assembly of the equipment
for operator through direct support maintenance as authorized by the Maintenance Allocation Chart (MAC).
1-2. MAINTENANCE FORMS, RECORDS, AND REPORTS. Department of the Army forms and procedures
used for equipment maintenance will be those prescribed by DA Pam 738-750, The Army Maintenance
Management System (TAMMS).
1-3. REPORTING EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIRS).
If your
hypochlorination unit needs improvement, let us know. Send us an EIR. You, the user, are the only one who can
tell us what you dont like about your equipment. Let us know why you dont tike the design or performance. Put
it on a SF 368 (Quatity Deficiency Report). Mail it to us at: Commander, U.S. Army Aviation and Troop Command,
ATTN: AMSAT-I-MDO, 4300 Goodfellow Blvd., St. Louis, MO 63120-1798. We will send you a reply.
1-4. WARRANTY INFORMATION. The hypochlorination unit is warranted by Waltron Ltd. for 18 months from
date of delivery. Report all defects in material or workmanship to you supervisor who will take appropriate
action.
1-5. DESTRUCTION OF ARMY MATERIEL TO PREVENT ENEMY USE. Destruction of Army materiel to
prevent enemy use is described in TM 750-244-3.
1-6. PREPARATION FOR STORAGE OR SHIPMENT. Preparation instructions for storage or shipment are
found in Chapter 4, Section VI.
Change 2
1-1
![](//www.tpub.com/assessment.jpg)