TM 5-4610-233-13&P
4-26. REPLACE FLOW CONTROLLER.
This task covers:
a. Remove.
b. Inspect.
c. Install.
lNITIAL SETUP
a Tools. Tool Kit (Appx B, Sect III, Item 1).
b. Materials/Parts. Tape, Antiseize (Appx E, Sect II,Item 4).
c. Equipment Condition.
Outlet hose assembly removed (paragraph 4-15).
Drain hose assembly removed (paragraph 4-17).
REMOVE
a. Loosen two hose clamps (1).
b. Remove two tubes (2), hose clamps (1)
c. Remove street elbow (4).
and hose connectors (3).
d. Remove eight nuts (5) and flat washers (6) and two U-bolts (7).
Change 2
4-31