TM 55-1930-209-14&P-11
A7-7
R/O Block No. 2 Salinity
A8-3
Fuel Tank No. 1 (Starboard)
A8-4
Fuel Tank No. 2 (Port)
S1-1
Bilge Void No. 1
S1-2
Bilge Void No. 2 Starboard
S1-3
Bilge Void No. 3 Port
S2-2
Power Failure (Chlorination Unit)
S2-3
Low Salinity (Chlorination Unit)
S2-4
Recirculating Pump Failure (Chlorination Unit)
S2-5
Sludge Tank Level
4-18.2.2 20-terminal box
a.
Check connections and continuity of cable C-5 between main processor and terminal box. Tighten cable
connections, or repair or replace bad wires or cable. If cable is good, go to step b.
b.
Check connections and continuity of the following cables between terminal box and sensor/switches. Tighten
cable connections or repair or replace bad wires or cable. If cable is good, notify intermediate general support.
Cable
Main Processor to Sensor/Switch
A7-5
Discharge Pressure (Shore Discharge Line)
A7-8
Salinity (Shore Discharge Line)
R-1
Flow Rate (Shore Discharge Line)
S1-4
Bilge Void No 3 Starboard
S1-5
Bilge Void No. 3 Port
S1-6
Bilge Void No. 4 Starboard
S1-7
Bilge Void No. 4 Port
S1-8
Bilge Void No. 5
S1-11/S1-12
155 kW Generator Set No 1
S1-13/S1-14
155 kW Generator Set No. 2
S1-15/S1-16
20 kW Generator Set
S2-8/S2-9
ROWPU High-Pressure Pump Diesel Engine No. 1
S2-10/S2-11
ROWPU High-Pressure Pump Diesel Engine No. 2
4-18.2.3 Replacement
a.
Removal
(1)
Tag and disconnect all cables to terminal box.
(2)
Remove mounting hardware and remove terminal box.
b.
Installation
(1)
Install terminal box and secure with mounting hardware.
(2)
Connect cables.
4-16