TM 55-1930-209-14&P-15
5-10.2.4 Draining diesel generator crankcase oil using bilge pump
a.
Get utility hose from hose rack in void 5.
b.
Disconnect crankcase drain valve and void suction valve quick disconnect couplings for generator listed below.
SSG 1
SSG 2
SAG
(155 kW),
(155 kW),
(20 kW),
portside aft
starboard aft
starboard aft
BD16
BD17
BD18
and
and
and
BD2
BD10
BD10
c.
Connect utility hose to both valve quick disconnects.
d.
Open valves after hose is connected.
e.
Start bilge pump by pushing START button on bilge pump motor controller.
f.
As soon as bilge pump starts, check hose connections.
g.
Drain until crankcase is empty and stop pump by pushing STOP button on motor controller.
h.
Close valves opened in step b.
i.
Disconnect hose and replace caps on quick disconnect couplings.
j.
Flush hose clean and return to hose rack in void 5.
k.
Clean up spills. If leaking, stop pump by pushing STOP button on motor controller, reconnect hose and restart
pump.
5-10.2.5 Draining ROWPU HP pump crankcase using bilge pump
a.
On Barge 1, proceed as follows:
(1)
Open crankcase drain valve BD12 to drain ROWPU 1 crankcase or BD13 to drain ROWPU 2 crankcase.
b.
On Barges 2 and 3, proceed as follows:
(1)
Get utility hose from rack in void 5.
(2)
Remove cap off of ROWPU 1 crankcase drain valve BD12 or ROWPU 2 crankcase drain valve BD13 and
drain to sludge tank valve BD19.
(3)
Connect utility hose to both valve quick disconnects.
(4)
Open valves after hose is connected.
c.
Start bilge pump by pushing START button on bilge pump motor controller.
d.
As soon as bilge pump starts, check hose connection for leaks. If leaking, stop pump by pushing STOP button on
motor controller, reconnect hose and restart pump.
e.
Drain until crankcase is empty and stop pump by pushing STOP button on motor controller.
f.
Close valves opened in steps a and b.
g.
On Barges 2 and 3, disconnect hose and replace caps on quick disconnect couplings. Flush hose clean and
return to hose rack in void 5.
h.
Clean up spills.
5-21