TM 55-1930-209-14&P-15
g.
Install ashpan.
h.
Close (ON) power panel 3 circuit breaker 5P13 for forward toilet or 4P13 for aft toilet tagged in step a.
i.
Remove red tag.
j.
Check toilet for normal operation. Troubleshoot according to paragraph 5-15.1 if necessary.
5-16.3 Bilge system repair
WARNING
Be sure electrical power Is off before performing maintenance on bilge pump. Be
sure pump Is cool before making repairs.
5-16.3.1 Bilge pump repair
a.
Open (OFF) power panel 1 circuit breaker 12P5. Redtag circuit breaker REPAIRS BEING MADE - DO NOT
ACTIVATE."
b.
Close valves BD7, BD11 and BD14 (Figure 5-2).
c.
Place container under piping and disconnect piping.
d.
Disassemble, repair, and reassemble pump according to Moyno SP Pumps Service Manual in Appendix B.
Repair parts are listed in Appendix G.
e.
Connect piping.
f.
Remove red tag warning and close (ON) power panel 1 bilge pump circuit breaker 12P5.
g.
Start and check that pump operates normally.
h.
Record repair in maintenance logbook.
i.
Dump liquid in container into aft drain in ROWPU spillage catchment.
5-16.3.2 Strainer basket cleaning or replacement
a.
Loosen yoke screw until yoke swings free.
b.
Pull basket handle straight up to remove basket. Go to step c to clean basket or to step d to install new basket.
CAUTION
Do NOT have basket well open for more than 10 minutes. Diverter plug does not
completely cut off water and water will seep Into open well.
c.
Clean basket as follows:
(1)
On weatherdeck, clean basket with soft brush and flush with drinking water.
(2)
Use compressed air to dislodge difficult particles.
(3)
Flush with drinking water.
(4)
Wipe interior of basket with clean cloth before replacing basket.
CAUTION
Do NOT use any petroleum based products to clean basket. Be careful not to
damage basket. Do not use wire brush.
5-29