TM 55-1930-209-14&P-19
Table 3-3. Preventive Maintenance Checks and Services for ROWPU System (Continued)
B -
Before
D -
Daily
Q - Quarterly
D -
During
W -
Weekly
S - Semiannually
A -
After
M -
Monthly
A - Annually
INTERVAL
ITEM
PROCEDURES
EQUIPMENT
ITEM
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
3) Close valve RO14 on hose connected
to small threaded drum bunghole.
4) Disconnect hose containing valve
RO14.
5) Tip drum from vertical position and
remove using drum lifter and bridge
crane with 2-ton hoist.
NOTE
Membrane cleaning agent drum is normally
painted black.
6) Use drum lifter and bridge crane with
2-ton hoist to position drum to stand
so large bunghole is on bottom and
small bunghole is on top when drum is
tipped into place.
7) Connect hose containing valve RO14
to small threaded drum bunghole.
8) Connect hose containing valve RO13
to large threaded drum bunghole.
4
*
*
*
*
Media Filters
a. Check each media filter unit for damage
and leaks. Check vent valve for proper
operation. Replace vent valve as
required. Unscrew existing air vent on
top of media tank and install new vent
(P/N 51896-1).
*
b. Backwash and flush media filters when
Pressure in P1
pressure difference between seawater
and P2 exceeds
pump discharge pressure gauge P1 and
35 psi.
media filter output gauge P2 exceeds 35
psi, when MEDIA FILTER LIGHT OK light
goes out, or when water sample taken
from cartridge filter assembly drain valve
RO8 is dirty.
3-11