TM 55-1930-209-14&P-19
Table 3-3. Preventive Maintenance Checks and Services for ROWPU System (Continued)
B -
Before
D -
Daily
Q - Quarterly
D -
During
W -
Weekly
S - Semiannually
A -
After
M -
Monthly
A - Annually
INTERVAL
ITEM
PROCEDURES
EQUIPMENT
ITEM
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
*
*
b. Check fuse on metering pump. Replace if
Fuse blown.
necessary.
*
*
c. Make sure coagulant and inhibitor drums
Drums empty.
each contain at least 2 to 3 gal of liquid. If
level is low, disconnect metering pump
hoses and replace drums as follows:
WARNING
Avoid exposure to coagulant and inhibitor.
Wear safety goggles or face shield and rub-
ber gloves when working around chemicals.
If chemical Is swallowed, do not Induce
vomiting. Drink water and seek medical
attention. If chemical gets In eyes, flush
with water and seek medical attention. If
chemical contacts skin, wash with soapy
water.
NOTE
Pump section hose enters drum through
the larger of two plastic lungs which are
screwed into the drum.
1) Remove suction hose, with suction
foot valve and weight attached, from
empty drum.
NOTE
Drum breather (vent) hose enters drum
through smaller plastic lung and hangs
over side.
2) Remove breather hose.
3) Remove empty drums and replace
with full drum.
CAUTION
Carefully read labels on drums to insure
that proper drum is being connected.
Change 1 3-7