TM 55-1930-209-14&P-19
Section II
Table 9-3. Preventive Maintenance Checks and Services for Electrical Power Systems
B -
Before
D -
Daily
Q - Quarterly
D -
During
W -
Weekly
S - Semiannually
A -
After
M -
Monthly
A - Annually
INTERVAL
ITEM
PROCEDURES
EQUIPMENT
ITEM
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
NORMAL
ELECTRICAL
POWER SYSTEM
NOTE
Only qualified personnel, using proper
and authorized test equipment, are
authorized to work on electrical power
system components. This system has
been designed and constructed to be
primarily maintenance free between
major shipyard overhauls.
NOTE
If electrical system fails to operate,
troubleshoot according to TM 55-1930-
20914&P-9. Report deficiencies and
failures to shift leader or bargemaster.
Keep
electrical
power
systems
operational and PMCS logs current.
WARNING
Make sure electrical components and
circuits are turned OFF before starting
any
inspection
and/or
cleaning.
Observe all posted warnings and safety
precautions. Circuit breakers must be
open
(OFF).
Redtag
appropriate
switches and circuit breakers with:
"WARNING
DO
NOT
ACTIVATE.
REPAIRS BEING MADE."
1
·
·
Cables
a Visually check for loose or damaged
Loose or dam-
cables. Make sure all cables are firmly
aged cables.
attached, corrosion free, and not subject
to rubbing or chafing.
2
· ·
Electrical
b.Check for loose or damaged electrical
Electrical connec-
Switches,
connections, switches, wiring, mounting
tions, switches,
Mounting Systems systems, hangars, and electrical insulat-
wiring, mounting
and Wiring
ing material. Use insulated tools to
systems loose or
tighten.
damaged.
9-4
