TM 55-1930-209-14&P-19
Section II
Table 10-3. Preventive Maintenance Checks and Services for Lighting System
B -
Before
D -
Daily
Q - Quarterly
D -
During
W -
Weekly
S - Semiannually
A -
After
M -
Monthly
A - Annually
INTERVAL
ITEM
PROCEDURES
EQUIPMENT
ITEM
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
LIGHTING
SYSTEMS
1
Interior
Lighting System
WARNING
Be sure that electrical power is OFF before
performing any maintenance on electrical
systems. Redtag appropriate switches and
circuit breakers with: "WARNING - DO NOT
ACTIVATE. REPAIRS BEING MADE."
a. Check for damaged, loose, or frayed
Cables damaged,
cables and loose connections. Repair,
loose or frayed.
replace or tighten as necessary.
Connections loose.
b. Check for loose or missing securements
and fasteners. Tighten and replace as
necessary.
c. Clean lighting panels and switches with
dry, lint-free cloth or vacuum cleaner.
d. Check for burned out bulbs. Replace as
necessary.
e. Remove rust and corrosion. Touch up
paint in accordance with TB 43-0144 as
necessary. Do not paint threads or
labels.
2
Exterior
Lighting System
WARNING
Be sure that electrical power is OFF before
performing any maintenance on electrical
systems. Redtag appropriate switches and
circuit breakers with: "WARNING - DO NOT
ACTIVATE. REPAIRS BEING MADE."
Observe all safety precautions listed at the
beginning of this manual.
a. Check for damaged, loose, or frayed
Cables damaged,
cables, and loose connections. Repair,
loose or frayed.
replace or tighten as necessary.
Connections loose.
10-5
