TM 55-1930-209-14&P-19
Table 2-4. Preventive Maintenance Checks and Services
for Workboat, Lifesaving, and Firefighting System (Continued)
B -
Before
D -
Daily
Q - Quarterly
D -
During
W -
Weekly
S - Semiannually
A -
After
M -
Monthly
A - Annually
INTERVAL
ITEM
PROCEDURES
EQUIPMENT
ITEM
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
8) Reassemble parts in reverse order of
disassembly using new gasket and
impeller seal. Tighten impeller screw
to 70 Ib/ft torque, mounting screw to
24 ib/ft, and cover nuts to 14 lb/ft.
9) Remove pump "OUT OF SERVICE"
tag upon completion.
t. Inspect pump suction hoses and exhaust
Exhaust hose
hose for damage or wear. Notify shift
damaged.
leader or bargemaster if repair or
replacement is required.
u. Inspect valves, strainer, and adapter for
Valves inoperable.
damage and wear. Clean as necessary.
Operate valves to prevent sticking. Notify
shift leader or bargemaster of any defi-
ciencies.
17-44