TM 55-1930-209-14&P-3
APPENDIX B
Preventive maintenance checks and services (PMCS) for ROWPU System
B-1 Introduction to PMCS
NOTE
TM 55-1930-209-14&P-19 contains PMCS for all systems on the ROWPU Barge. This appendix
contains only PMCS for the ROWPU System
NOTE
Additional operation, maintenance and parts Information may be found in the following technical
manuals which cover the 150,000 Reverse Osmosis Water Purification Unit: (ROWPU):
TM 10-4610-229-10, Operator's Manual for 150,000 ROWPU
TM 10-4610-229-24, Unit, Direct and General Support Maintenance Manual for 150,000 ROWPU
TM 10-4610-229-24P, Repair Parts and Special Tools List for 150,000 ROWPU
a.
General.
(1)
Systematic (B) before, (D) during, (A) after, and scheduled periodic PMCS are essential to ensure that the
Reverse Osmosis Water Purification Barge is in operational readiness at all times. The purpose of the
PMCS program is to discover and correct deficiencies and malfunctions before they cause serious damage
or failure of the barges and their support systems. An effective PMCS program requires that operators
report all unusual conditions noticed before, during and after operation as well as while performing periodic
PMCS. All deficiencies and malfunctions discovered during maintenance inspections must be recorded,
together with the corrective action taken, on DA Form 2404 (Equipment Inspection and Maintenance
Worksheet).
(2)
A schedule for preventive maintenance inspections and service should be established and adhered to.
When operating under unusual conditions, such as extreme heat or cold, it may be necessary to perform
PMCS more frequently.
(3)
The PMCS items have been arranged and numbered in a logical sequence to provide for greater efficiency
and the least amount of downtime required for maintenance.
b.
PMCS columnar entries.
(1)
Item Number Column. Checks and services are numbered in chronological order regardless of interval.
This column is used as a source of item numbers for the "Item Number" column on DA Form 2404,
Equipment Inspection and Maintenance Worksheet, in recording results of PMCS.
(2)
Interval Column. The interval columns tell you when to do a certain check or service: before, during, or
after operation. Sometimes a dot may be placed in more than one interval column which would mean you
should do the check or service at each of those intervals.
(3)
Item to Be Inspected Column. This column lists the common name of the item to be inspected such as
"Air Filters."
(4)
Procedures Column. This column tells you how to do the required checks and services. Carefully follow
these instructions.
(5)
Equipment is Not Ready/Available if Column. This column tells you when and why your equipment cannot
be used.
B-1