TM 55-1930-209-14&P-4
Table 4-2. Preventive Maintenance Checks and Services for Chlorination System (Continued)
B - Before
D - Daily
Q - Quarterly
D - During
W - Weekly
S - Semiannually
A - After
M - Monthly
A - Annually
Interval
Procedures
Item
Check For And Have
Equipment
Item
To Be
Repaired Or Adjusted
Is Not Ready/
No.
B
D
A
D
W
M
Q
S
A
Inspected
As Necessary
Available If
6
Brine Tank
a.
Check brine tank salt level and add salt
as necessary.
b.
Check cooling water and makeup water
flowmeter and ammeter readings. Adjust
water and brine feed control.
c.
Check condition of cells for scale buildup.
Descale when necessary as follows:
1)
Rush with seawater.
(a) Check that seawater system is
operating and providing sea-
water to chlorination system thru
seawater SW47 or SW48.
(b) Turn alarm ON/OFF switch on
control cabinet to OFF.
(c) Turn function switch on control
cabinet to OFF/RESET.
(d) Position chlorination unit (CU)
valves as indicated below:
O - open X = closed A = position A
B - position B C. = position C
CU Valve No.
Valve Position
2
x
2A
X
3
B
5
A
6
x
6A
X
8
x
9
x
12
x
16
O
(e) Position valve CU4 halfway
between position A and C to
reduce flow thru system.
(f) Turn brine pump ON/OFF
switch inside control cabinet
to OFF.
C-6