TM 55-1930-209-14&P-4
Table 4-2. Preventive Maintenance Checks and Services for Chlorination System (Continued)
B - Before
D - Daily
Q - Quarterly
D - During
W - Weekly
S - Semiannually
A - After
M - Monthly
A - Annually
Interval
Procedures
Item
Check For And Have
Equipment
Item
To Be
Repaired Or Adjusted
Is Not Ready/
No.
B
D
A
D
W
M
Q
S
A
Inspected
As Necessary
Available If
12)
Rush chlorination unit with seawater
before returning to normal operation
as follows:
(a) Turn valve CU3 to position B,
WATER, to allow seawater to
flush out acid.
(b) Turn valve CU5 to position A,
DRAIN, to allow flushing seawater-
to drain to sump tank.
(c) Turn function switch to FLUSH.
(d) Flush to remove acid for 5 minutes
Turn function switch on
control cabinet to OFF/RESET.
(e) Return system to normal operation
8
·
Brine Feed
Check that oil level in chlorination unit brine
Pump
feed pump is above indicated mark in air
bleeder filler reservoir. Add oil as necessary.
9
Metering Pump
Check sight on metering pump to ensure oil
level is at mark. Add oil as necessary.
10
Metering Pump
Monitor metering pump control unit to
Control
Unit assure chlorine status on LED display.
11
·
Chlorination Unit
a.
Monitor ammeter to assure reading is
Control Cabinet
between 950-1000A (0.95-1,0kA).
b.
Monitor voltmeter to assure reading is
between 6.0-6.5 Vdc.
12
Equipment
a.
Monitor CHLORINE STATUS display
Monitoring
page for chlorine content and pump
System
position.
b.
Monitor SYSTEM STATUS display page
to assure:
1)
CHLORINE OPERATING OFF is
normal.
C-9