VI. RECOMMENDATIONS FOR DEPLOYMENT AND RETRIEVAL
The procedure to be followed for the Deployment and Retrieval of the Drinking Water Discharge Line depends to a great
extent on the environmental conditions at the site. The following are general guide lines and instructions to be followed.
See figures VI-1 and VI-2. It is assumed that the ROWPU barge has been moored off the shore with its stern oriented
toward the objective area on the beach. The Coflexip pipe is empty and stored onto the winch drum.