TM 55-2090-201-14&P
3-3. OPERATORS TROUBLESHOOTING PROCEDURES (Continued).
Table 3-5.
Test Procedures for Electrical and Electronic Components,
Type B Separators (Continued).
Meter
Reading
Test Procedure
(VDC)
Test Conditions
Remarks
4.
(Continued)
F. To replace a
solenoid coil
refer to para
3-24.
5. To Verify 120 VAC
output to invert-
er to control
circuit:
Connect the test
meter leads to
terminal contacts
14 and 17.
5. Check power leads
for proper polarity
and reverse leads
if improperly con-
nected.
3-39