TM 55-2090-201-14&P
3-24.
OIL DISCHARGE VALVE, SOLENOID OPERATED [1st (Prefilter) and
2nd STAGE ONLY], TYPE A AND B SEPARATORS (Continued).
LOCATION
ITEM
ACTION
R E M A R K S
4. 1st (pre- a. Valve
filter)
bonnet
and 2nd
(17)
stage
solenoid
coil and
valve
b. Coil
bonnet
(13)
c. Coil
housing
(9)
d. Leads
tee
(6) and
cover
(2)
Repeat steps 4 a
thru d to install sensor coil and
Install valve bonnet (17),
with diaphragm and related
parts attached, to valve
body with lockwashers (16)
and screws (15).
(1) Install nipple (11) in
pulling elbow (12).
(2) Position baseplate (14)
over end of solenoid
base and secure to nip-
ple with locknut (10).
(3) Thread coil leads thru
pulling elbows and into
tee (4).
(4) Insert coil (13) over
end of solenoid base.
Position coil housing (9)
and nameplate (8) over coil
(13) and secure with retain-
ing cap (7).
(1) Reconnect coil leads (6)
using connectors (5).
(2) Position gasket (3) in
place on tee (4).
(3) Install cover (2) on tee
(4) using screws (1).
NOTE
valve bonnet on prefilter separator.
3-146