• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PMCS PROCEDURES
Table 2-1. Operation Preventive Maintenance Checks and Service

TM-10-4610-244-13 Hypochlorination Unit NSN 4610-01-364-4485 Model AHY001 Manual
Page Navigation
  5    6    7    8    9  10  11    12    13    14    15  
TM 10-4610-244-13 TM 09476B-13/1 2-4.  LEAKAGE DEFINITIONS FOR OPERATOR PMCS (Cont'd). c. CLASS III Leakage of fluid great enough to form drops that fall from item being checked/inspected. 2-5.  SPECIAL INSTRUCTIONS.  If equipment must be kept in continuous operation, check and service only those items that   can   be   checked   and   serviced   without   disturbing   operation.      Make   complete   checks   and   services   when hypochlorination unit can be shut down. 2-6.  PMCS TABLE.  Refer to Table 2-1 for operator Preventive Maintenance Checks and Service for hypochlorination unit. 2-5







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.