• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 2-1. Operation Preventive Maintenance Checks and Service
SECTION III.  OPERATION UNDER USUAL CONDITIONS - TM-10-4610-244-13_22

TM-10-4610-244-13 Hypochlorination Unit NSN 4610-01-364-4485 Model AHY001 Manual
Page Navigation
  7    8    9    10    11  12  13    14    15    16    17  
TM 10-4610-244-13 TM 09476B-13/1 Table 2-1. Operator Preventive Maintenance Checks and Service for Hypochlorination  Unit (Cont'd). LOCATION NOT FULLY ITEM ITEM TO BE MISSION CAPABLE NO INTERVAL CHECK/SERVICE PROCEDURES IF: 10 Before Frame Inspect frame for chips In paint or bare metal or evidence of corrosion 11 During Sight assembly a.   Inspect to ensure portioning pump is pumping as evidenced by movement of diaphragms b.   Inspect for leaks Class III leak 12 During Lines and fitting, Inspect for leaks Class III leak 13 During Wasteline Check that waste, water is discharging No water discharging 14 During Reservoir Check Ievel of solution in reservoir less than 3 Inches of Solution 15 During Treated water Sample for chlorine content CAUTION Hypochlorite solution is corrosive and sedimentary.  Do not leave solution sedimentary in reservoir, or lines 16 After Reservoir and Flush with clean water for ten minutes solution tubing (Paragraph 2-12) 17 After All components Drain unit completely) that are in contact Paragraph  2-12) with Liquid 2-7







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.