TM 10-4610-229-10
2-5. STARTUP (CONT)
6 Open cartridge filter drain valve and check that water is clear. Close drain valve.
7 Check that flowmeter FI-1 shows less than 350 gpm.
8 Increase pressure at PI-1 to 100 psi (6.8 kPa x 100) by turning speed control screw on boost pump diesel
engine right. Refer to para 2-5f.
2-104