TM 10-4610-232-12
SERVICE.
a.
If measurement is more than 14 inches but less than 18 inches, add media at next scheduled shutdown. If more than 18
inches do not operate ROWPU until media level has been corrected. Correct media level is 14 to 18 inches.
b.
Install cap (5), gasket (6), and clamp (4) and return steel rule (7) to storage box no. 2. Clean gasket area before installing cap
(5) and clamp (4).
3-24. REPAIR CLEAN FLUSH TANK ASSEMBLY. This task covers replacement of connector gaskets as described in
paragraph 3-8.
3-25. REPAIR POLYELECTROLYTE TANK COMPONENTS AND COVERS. This task covers replacement of connector gaskets as
described in paragraph 3-8.
3-26. REPAIR SEQUESTRANT TANK COMPONENTS AND COVERS. This task covers replacement of connector gaskets as
described in paragraph 3-8.
All data on pages 3-51 and 3-52 deleted.
3-50 Change 12