TM 10-4610-232-34Table 2-1. Direct Support Troubleshooting Guide (Continued)MALFUNCTIONTEST OR INSPECTIONCORRECTIVE ACTIONStep 10. Check the backwash pump connector, P45, and cable for damage. If no damage is found, replace thebackwash chlorine pump (para. 4-37 of TM 10-4610-232-12).Step 11. Check for continuity and shorts from P16D to J45A and from P16E to J45B.Replace/repair the connectors as necessary (para. 2-18).Step 12. Shut down ROWPU and generator. Refer to electrical drawings in Appendix D and remove wire #2A fromK13. Remove connector P16 from the side of the control panel. Check continuity, point-to-point, from CB9(REF: Interconnection diagram FO-2, Sheet 8) (wire #284) to relay K13(K1). (Schematic line 721). Depress theindicating plunger on relay K11 when testing its contact. Check continuity, point-to-point, from transformerT1(X2) (REF: Interconnection diagram FO-2, Sheet 10) to relay K13 (wire #2A).(a) Repair any loose or damaged wire (para. 2-20).(b) Replace relay K11 if its contact does not close when the indicating plunger is depressed (para. 2-23).(c) Replace timer TDK3 (REF: Interconnection diagram FO-2, Sheet 8) if its terminals (9-10) do not showcontinuity (para. 2-23).(d) Replace relay K13 if the above checks do not locate the problem (para. 2-23).Step 13. Shut down ROWPU and generator. Refer to electrical drawings in Appendix D. Remove connector PI 6 fromthe side of the control panel. Check continuity, point-to-point, from CB9 (wire #264) to J16N. (Schematiclines 721 -728.) Depress the indicating plunger on relay K11 when testing its contact. Check continuity,point-to-point, from transformer T1(X2) to J16P.(a) Repair any loose or damaged wire (para. 2-20).(b) Replace relay K11 if its contact does not close when the indicating plunger is depressed (para. 2-23).(c) Replace timer TDK2 if its terminals (9-10) do not show continuity (para. 2-23).(d) Replace/repair J16 if faulty (para. 2-23).Step 14. Shut down ROWPU and generator. Refer to electrical drawings in Appendix D. Remove connector P16 fromthe side of the control panel. Check continuity, point-to-point, from CB9 (wire #264) to J16D. (Schematic line730,) Depress the indicating plunger on relay K13 when testing its contact. Check continuity, point-to-point,from transformer T1(X2) to J16E.(a) Repair any loose or damaged wire (para. 2-20).(b) Replace relay K13 if its contact does not close when the indicating plunger is depressed (para. 2-23).(c) Replace/repair J16 if faulty (para. 2-21).Step 15. Shut down ROWPU and generator. Refer to electrical drawings in Appendix D. Remove connector PI 6 fromthe side of the control panel and the wires from terminal 2 of TDK2. Check continuity, point-to-point, fromCB9 (wire #264) to TDK2 (terminal 1), (Schematic line 722.) Depress the indicating plunger on relay K11when testing its contact. Check continuity, point-to-point, from transformer T1(X2) to TDK2 (wire #2A).(a) Repair any loose or damaged wire (para. 2-20).(b) Replace relay K11 if its contact does not close when the indicating plunger is depressed (para. 2-23).Step 16. Check continuity from TDK2 (terminal 1) to TDK2 (terminal 8).(a) Repair any loose or damaged wires (para. 2-20).(b) Replace TDK2 if the check in steps 15-16 have not isolated the problem (para. 2-23).Change 1 2-53
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business