CAUTION
Follow the exact order of shutdown steps in table 2-5 to prevent damage to the ROWPU.
Table 2-5. Shutdown Position of Valve or Switch
Order
Valve or Switch
Position
1
Prime
2
Fully counterclockwise
3
REGULATE PRODUCT FLOW valve
OPEN
4
OPEN
CAUTION
After opening the REGULATE
PRODUCT FLOW valve fully,
wait 5 minutes before opening
vent vessels valve.
5
OPEN
6
VENT CARTRIDGE FILTER valve
OPEN
7
VENT PULSE DAMPENER valve
OPEN
8
OPEN
9
R.O. PUMP switch
STOP
10
BOOSTER PUMP switch
STOP
11
CHEMICAL FEED PUMP switch
STOP
12
RAW WATER PUMP NO. 2 switch
STOP
13
RAW WATER PUMP NO. I switch
STOP
NOTE
CB-2, CB-8 AND CB-9 must
remain on (up) to perform
backwash procedures.
14
CIRCUIT BREAKERS CB-1 THRU CB-9
OFF(DOWN)
2-77