TM 10-4610-240-24
TM 08580C-24/2
TO 40W4-13-22
2-42. FLOW METER (PRODUCT WATER) MAINTENANCE.
This task consists of
a. Removal
b. Installation
INITIAL SET-UP:
Tools Required
General Mechanics Tool Kit (Appendix B, Section III, Item 4)
Material/Parts Required
Tape, Anti-seize (Appendix C, Section II, Item 30)
Tape, insulating (Appendix C, Section II, Item 32)
Lockwasher (2) - MS35338-139
Gasket- M103873 DOZ
Equipment Condition
Reference
ROWPU shutdown (TM 10-4610-240-10).
Power shutdown (power source manual).
ROWPU piping drained (TM 10-4610-240-10)
REMOVAL
a
Remove cap (2) from pipe section (20).
b
Disconnect tubing (23) from pipe section (20)
c.
Remove two nuts (7), screws (11), clamp halves (10), and gasket (8) from pipe sections (6 and 9).
d
Remove four screws (14) and starwashers (13) from bracket (12).
e
Remove four nuts (3), lockwashers (4), screws (5), and bracket (12) from control panel (1).
f
Loosen two nuts (21)
g
While supporting flowmeter (15), remove two nuts (18), lockwashers (19), screws (22), and two-piece scrap
(17)
h.
Remove pipe sections (20 and 6) with flowmeter (15) from control panel (1).
i.
Remove two pipe sections (6 and 20) from flowmeter (15)
j
Remove insulating tape (16) from pipe section (20)
k
If required, remove adapter (24) from pipe section (20)
2-166