TM 10-4610-241-10
TO 4OW4-13-41
2-17. PREPARATION FOR MOVEMENT - cont.
(9)
Empty chemical feed cans and rinse with brine water.
(10)
Install caps and plugs on chemical cans.
(11)
Install caps and plugs on chemical feed hoses.
(12)
Install tie strap over chemical cans.
( 13)
(WPES-10 and H-9518-1) Secure chemical feed can frame to trailer frame with tie down straps.
d.
Take down product water system. Refer to figure 2-38.
Steps 1-6 are only applicable if the ocean intake structure was used.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
Make sure storage tank holds at least 100 gallons.
Close dispensing nozzle.
Turn on distribution pump.
Use nozzle to thoroughly wet sand around wellpoints.
Turn off pump.
Pull out wellpoints by hand.
Disconnect dispensing nozzle from discharge hose.
Open gate valve between product water tank No. 1 and No. 2.
Set DISTRIBUTION PUMP switch (41, figure 2-5) to START. Allow pump to operate until all water is
drained from both product water tanks.
Set DISTRIBUTION PUMP switch to OFF, Set DISTRIBUTION PUMP circuit breaker CB-5 (49, figure 2-
5) to off (down).
Disconnect distribution pump electrical cable from DISTRIBUTION PUMP connector on control panel.
Install plug on end of electrical cable and cap on DISTRIBUTION PUMP connector.
Roll up electrical cable onto distribution pump frame (figure 2-38).
Turn distribution pump on end so that pump end is down toward ground, and allow all water to drain from
pump.
Disconnect gate valve, adapters and all hoses (para 2-7n). Allow components to drain and dry.
Install caps and plugs on hoses.
Roll up collapsible hoses.
Prepare water tanks for movement (TM 5-5430-227-12&P/TO 37A12-1-121).
2-134 Change 2