2-17. PREPARATION FOR MOVEMENT - cont.
f
Take down raw water system.
(1)
Set RAW WATER PUMP NO. 1 CB-3 circuit breaker (47, figure 2-5) and RAW WATER PUMP NO. 2
CB-4 circuit breaker (48) to off (down).
(2) Disconnect RAW WATER PUMP NO.1 and NO. 2 electrical cables from distribution panel. Install caps on
electrical receptacle.
(3)
Install plug on raw water pump electrical cables and wind cable onto pump frames.
(4)
Open drain and vent valves on both raw water pumps (figure 2-26 and 2-27). Allow water to drain, then
close drain and vent valves.
(5)
Disconnect strainer and float from suction hose (figure 2-35). Untie float from strainer.
(6)
Disconnect all hoses and allow to drain.
(7)
Install caps and plugs on hoses.
(8)
Roll up collapsible hoses.
g.
Take down waste water system. Refer to figure 2-39.
(1) Disconnect canvas discharge hoses from WASTE and VENT VESSELS couplings on ROWPU control
panel.
(2)
Allow hoses to drain, then install caps and plugs.
(3)
Roll up collapsible hoses.
h.
Remove TDS Monitor. Refer to figure 2-33.
(1)
Unscrew knurled ring on power cable connector (12) from TDS MONITOR POWER receptacle (14). Pull
power cable connector from receptacle.
(2)
Install cap (13) on TDS MONITOR POWER receptacle (14).
(3)
Install plug (11) in power cable connector (12).
(4)
Unscrew knurled ring on sensor cable connector (8) from TDS MONITOR SENSOR receptacle (10). Pull
cable connector from receptacle.
(5)
Install cap (9) on TDS MONITOR SENSOR receptacle (10).
(6)
Install plug (7) in sensor cable connector (8).
(7)
While depressing detent button (2) with thumb, pull quick release pin (3) from hole (6) in base of TDS
monitor (1) and into control panel (4).
(8)
Slide base of TDS monitor (1) out from under two brackets (5).
2-136