TM 10-4610-241-24
TO 4OW4-13-42
2-77. FLATBED CARGO TRAILER REPAIR (WPES-1O AND H-9518-1).
This task consists of:
a. Removal
b. Installation
c. Service
INITIAL SET-UP:
Tools required
General Mechanics Tool Kit (Appendix B Section III, Item 4)
1 -l/8 Inch Wrench (Appendix B, Section III, Item 3)
Vise (Appendix B, Section III, Item 3)
Material /Parts Required
Lockwashers and Gaskets (TM 10-4610-241-24P)
Equipment Condition
Reference
Power shut down (GeneratorManual).
Trailer disconnected from Towing Vehicle (TM 10-4610-241 -10).
Personnel Required
Two
General Safety Instructions
WARNING
Lunette is heavy/difficult to handle. To prevent injury, use two people to lift
REPLACE REFLECTORS
NOTE
There are eight reflectors on the trailer, one is shown the others are similar.
a.
Removal.
(1)
Remove two screws (1) and ring (2) from reflector (3).
(2)
Remove reflector (3) and gasket (4) from frame (5).
b.
Installation.
(1)
Position gasket (4) and reflector (3) on frame (5).
(2)
Install ring (2) and two screws (1) on reflector (3).
2-300 Change 1