3-24. CABLE ASSEMBLY W38 (GROUND CABLE) REPAIR
This task consists of:
a. Removal
c. Inspection
e. Installation
b. Cleaning
d. Repair
INITIAL SET-UP:
Tools Required
General Mechanics Tool Kit (Appendix B, Section III, Item 4)
Refer to TM 43-0158/TO l-1A-15 (Air Force) for Tools required to inspect and repair Cable Assembly.
Materials/Parts Reauired
Rags, Wiping (Appendix C, Section II, Item 14)
Refer to TM 43-0158/TO 1-1A-15 (Air Force) for Tools required to inspect and repair Cable Assembly.
Equipment Condition
Reference
Power shut down (Power Source Manual).
WARNING
High voltages in this equipment can cause serious injury or death. Be certain that all
power is removed before performing maintenance.
a.
Removal.
(1)
Remove nut (1), lockwasher (2), flatwashers (3), lockwasher (4) and screw (5), disconnecting cable
assembly (9) from ROWPU frame.
(2)
Remove nut (6), lockwasher (7), flatwashers (8) and cable assembly (9) from stud (10) at bottom of
junction box.
b.
Cleaning.
Clean cable assembly and mounting hardware with damp rags.
c.
Inspection.
For inspection procedures of cable assembly, refer to TM 43-0158/TO 1-1 A-15 (Air Force).
3-164