TM 10-4610-241-24
TO 40W4-13-42
3-55.
WIRING HARNESS, W4 (JUNCTION BOX/CONTROL BOX) REPAIR.
This task consists of
a.
Removal
b.
Cleaning
c.
Inspection
d.
Test
e.
Repair
f.
Installation
INITIAL SET-UP:
Tools Required
General Mechanics Tool Kit (Appendix B, Section III, Item 4)
Multimeter (Appendix B, Section III, Item 3).
Refer to TM 43-0158/TO 1-1A-15 (Air Force) for Tools required to repair Cable Assembly.
Material/Parts Required
Lockwashers (TM 10-4610-241-24P)
Tiedown straps (TM 10-4610-241-24P)
Refer to TM 43-0158/TO 1-1A-15 (Air Force) for Materials/Parts required to repair Cable Assembly.
Equipment Condition
Reference
Junction Box removed from ROWPU and Cover open (Paragraph 3-53)
a.
Removal.
(1) Disconnect wires (2) by removing screws (1) at termination points B (table, opposite page).
(2) Remove four nuts (3), lockwashers (4), flatwashers (5), screws (6) and cap (7).
(3) Remove tiedown straps (8) as necessary to release harness (9) from clamps 15) and other wiring.
(4) Remove wiring harness (9) and gasket (10) from junction box (16).
(5) As required, remove nuts (11), lockwashers (12), flatwashers (13), screws (14) and clamps (15).
b.
Cleaning.
Clean wiring harness with a damp rag and allow to dry.
c.
Inspection.
Inspect wiring harness in accordance with TM 43-0158/TO 1-lA-15 (Air Force).
d.
Test.
Check wiring harness for continuity and shorts using table (opposite page) as guidance.
3-316