TM 10-4610-241-24
TO 40W4-13-42
3-54.
WIRING HARNESS, W3 REPAIR.
This task consists of
a.
Removal
b.
Cleaning
c.
Inspection
d.
Test
e.
Repair
f.
Installation
INITIAL SET-UP:
Tools Required
General Mechanics Tool Kit (Appendix B, Section III, Item 4)
Multimeter (Appendix B, Section III, Item 3)
Refer to TM 43-0158/TO 1-lA-15 (Air Force) for Tools required to repair Cable Assembly.
Material/Parts Required
Lockwashers (TM 10-4610-241-24P)
Tiedown straps (TM 10-4610-241-24P)
Refer to TM 43-0158/TO 1-1A-15 (Air Force) for Materials/Parts required to repair Cable Assembly.
Equipment Condition
Reference
Junction Box removed from ROWPU and Cover open (Paragraph 3-53).
a.
Removal.
(1) Remove screws (1) and disconnect wire lugs (2) from termination points (table on opposite page).
(2) Cut tiedown straps (3), securing wiring harness (4) to clamps (9) and other wiring.
(3) Remove wiring harness (4) from junction box (10).
(4) As required, remove nuts (5), lockwashers (6), flatwashers (7) screws (8) and clamps (9).
b.
Cleaning.
Clean wiring harness with a damp rag and allow to dry.
c.
Inspection.
Inspect wiring harness in accordance with TM 43-0158/TO 1-1A-15 (Air Force).
d.
Test.
Check wiring harness for continuity and shorts using table (opposite page) as guidance.
e.
Repair.
Repair wiring harness in accordance with TM 43-0158/TO 1-1A-15 (Air Force).
3-314