TM 10-4610-244-13
TM 09476B-13/1
SECTION I.
REPAIR PARTS, SPECIAL TOOLS, TEST, MEASUREMENT, AND DIAGNOSTIC EQUIPMENT
(TMDE), AND SUPPORT EQUIPMENT.
4-1.
COMMON TOOLS AND EQUIPMENT.
a.
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment
(MTOE), CTA 50-970 or CTA 8-100 as applicable to your unit
b.
For mechanics tool kit, refer to Appendix B, Section II, Maintenance Allocation Chart for tool reference
usage.
4-2.
SPECIAL TOOLS, TEST, MEASUREMENT AND DIAGNOSTIC EQUIPMENT. No special tools, test,
measurement and diagnostic equipment are requited (see Appendix B, Section) III)
4-3.
REPAIR PARTS. Repair parts are listed and illustrated in the Repair Parts and Special Tools List (RPSTL, TM
10-4610-244-23P, TM 09476B-23 P/2)
SECTION II. RECEIVING AND PREPARING FOR MOVEMENT.
4-4.
SERVICE UPON RECEIPT. The following steps should be followed upon receipt of hypochlorination unit
a.
Unloading.
Hypochlorination unit is shipped in one crate. To unload, do following.
(1)
Check shipping crate for damage A damaged crate indicates possible damage to equipment.
(2)
Remove all blocking and tie downs that may have been used to secure crate to carrier
(3)
Using suitable material handling equipment, remove crate from carrier.
b.
Unpacking.
(1)
Remove packing material from hypochlorination unit.
(2)
Remove and retain technical publications envelope.
c.
Checking Unpacked Equipment. To check unpacked hypochlorination unit, do following:
(1)
Inspect equipment for damage incurred during shipment If equipment has been damaged, report
damage on SF 364, Report of Discrepancy
(2)
Check equipment against packing slip to see if shipment is complete Report all discrepancies in
accordance with instructions of DA PAM 738-750 or DA PAM 738- 751 as applicable.
4-3