ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0028 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT ARMY UNIT
Left End Packout
1. Coil the bisulfite pump discharge, suction, and return tubing together and strap them to the TWPS
frame behind the pump using a 12-in. hook and loop strap.
2. Coil the antiscalant and hypochlorite suction and return tubing together and strap them to the
TWPS frame behind the pump using a 12-in. hook and loop strap.
3. Pack the ground rod sections and the slide hammer rod in the storage brackets at the left front
corner of the skid and secure them with an 18-in. hook and loop strap (see Figure 5).
NOTE
The hammer section of the slide hammer will be packed out in BII Box #8.
GROUND RODS
18-IN. HOOK AND LOOP STRAP
SLIDE HAMMER ROD
Figure 5. Ground Rod and Slide Hammer Rod Storage.
4. Store the protractor (level) in the protractor (level) storage box on the cross support beam at the
left side of the Power Distribution Panel (see Figure 6).
PROTRACTOR (LEVEL)
PROTRACTOR (LEVEL)
STORAGE BOX
Figure 6. Level Storage.
0028 00-19