ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0028 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT ARMY UNIT
Suction Hose Packout
All of the raw water, waste, and distribution suction hoses are packed out lengthwise on top of the skid
frame, in front of the OISS components. These items are shown in Figure 8.
1. Secure the long section of two 10-ft.ratchet straps to the frame just in front of the OISS
components and lay the straps back over the OISS components within reach from the ends of the
frame.
2. Pack the suction hoses in the following order:
3 in. x 10 ft., (green-banded) raw water hoses - 13 each.
2 in. x 10-ft., (green-banded) raw water hose - 1 each. Place on top of the 3-in. hoses.
2 in. x 10 ft., (red-banded) waste hoses - 3 each. Place on top of the 3-in. hoses.
1-in. x 10 ft., (blue-banded) product water hoses - 4 each. Place on top of the 3-in.
hoses.
2 in. x 5 ft., (blue-banded) product water hoses - 5 each. Place on top of the 3-in. hoses.
4 in. x 5 ft., (red-banded) waste hose. Place on top of 3-in. hoses.
3-in. x 3-ft., (green-banded) raw water hose. Place on top of the 3-in. hoses.
3. Bring the two straps over the suction hoses and secure them to the frame (see Figure 8).
SUCTION HOSES
STRAPS ATTACHED TO FRAME IN FRONT OF PACKED OUT SUCTION HOSES
Figure 8. Suction Hose Packout.
0028 00-22