ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0056 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
UNIT MAINTENANCE PROCEDURES
AIR COMPRESSOR
3.
Inspect the regulator mounting for dirt and damage.
4.
Install the new regulator and secure with the two cap screws.
5.
Connect the top and bottom tubing connections.
6.
Adjust the new regulator as follows (see Figure 4):
NOTE
Turn the regulator adjusting screw clockwise
to
increase
pressure
or
counterclockwise to decrease pressure.
a.
Remove the gauge port cap.
b.
Install the 0-1000 psig pressure gauge to the gauge port of the regulator.
c.
Remove the cap nut and washer.
With the compressor running, set the regulator pressure to 850 70 psig.
d.
e.
Install the washer and cap nut.
f.
Stop the compressor, remove the pressure gauge, and reinstall the cap on the gauge
port.
GAUGE PORT CAP
GAUGE PORT
LOCKWASHER
CAP NUT
REGULATOR
ADUSTING SCREW
Figure 4. Oil Pressure Regulator Adjustment.
0056 00-6