TM 10-4610-310-14
0001 00
QUALITY OF MATERIAL
Material used for replacement, repair, or modification must meet the requirements of this manual. If the quality of
material requirements is not stated in this manual, the material must meet the requirements of the drawings,
standards, specifications, or approved engineering change proposals applicable to the subject equipment.
SAFETY, CARE, AND HANDLING
All warnings and cautions in the work packages (WP) must be followed to prevent death or injury to personnel or
damage to equipment. For periodic and routine maintenance procedures, see WP 0037 00.
COMMON TOOLS AND EQUIPMENT
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE)
as applicable to your unit.
REPAIR PARTS AND SPECIAL TOOL LISTS
Repair parts are listed and illustrated in the LWP repair parts and special tools lists, TM 10-4610-310-24P. The
special tools required are also provided.
OPERATOR TO MAINTENANCE COORDINATION
If a malfunction occurs during operation of the LWP and the correction is beyond the capability and capacity of
the specially trained water treatment specialists (MOS 92W), he/she will notify the next higher maintenance level
(unit). The specialist should communicate what the problem is and the part or parts involved. See DA PAM 738-
750, The Army Maintenance Management System (TAMMS).
Upon notification the maintenance section will provide a quartermaster and chemical equipment repairer (MOS
63J) to the operational area for repair, or remove and replacement of defective component or components. This
repair, remove, and replace action is preferable in the field environment. If this cannot be executed then the
complete module should be evacuated to the unit shop repair facility.
If the malfunction is beyond the capability and capacity of the unit repairer then the module should be evacuated
to the direct support/general support maintenance repair facility according to the unit maintenance Standard
Operating Procedures (SOP).
COPY RIGHT CREDIT LINE INFORMATION
Some procedures and illustrations are obtained from Yanmar Engine Manual with the explicit written permission
of Yanmar America Corporation.
END OF WORK PACKAGE
0001 00-4