TM 10-6630-246-12&P
TM 09241B-12&P
Section I. SERVICE UPON RECEIPT
2-1.
UNPACKING AND INSPECTION.
a.
Remove the Water Quality Analysis Set: Purification from the packing container.
b.
Open the case and inspect the equipment for damage incurred during shipment. If any equipment has been
damaged, report the damage on SF 364, Report of Discrepancy.
c.
Check that the set is complete. See appendix D, section II.
Section II. DESCRIPTION AND USE OF OPERATORS CONTROLS AND
INDICATORS
2-2.
CHEMICAL AGENTS WATER TESTING KIT.
See TM 3-6665-319-10.
2-3.
TOTAL DISSOLVED SOLIDS METER.
NOTE
If sample being measured is out of standard range, refer to calibration procedures in paragraph 2-9.
The controls and indicators are located on the meter front and top.
Figure 2-1. Total Dissolved Solids Meter
2-2