TM 10-6630246-12&P
TM 09241B-12&P
3-11.
TOTAL DISSOLVED SOLIDS METER.
This task covers:
a.
Inspection
b.
Testing
c.
Servicing
d.
Calibration
e.
Repair
INITIAL SETUP:
Materials/Parts
Rags
Detergent
(Appendix F, item 14)
(Appendix F, item 15)
Figure 3-4. Total Dissolved Solids Meter
a.
Inspection.
(1)
Check meter (1) for any visible damage. If damaged, notify supervisor.
(2)
Check cell cup (2) for any visible damage. If damaged, notify supervisor.
(3)
Check range extender (3) to see that o-ring (4) and white insert (5) is not damaged or missing.
b.
Testing.
Testing is performed during setup to use. See paragraph 2-9.
3-13