TM 3-4230-209-10
Table 2-2. OPERATOR'S PREVENTIVE MAINTENANCE CHECKS
AND SERVICES (PMCS) (CONT)
Item
Location, Item to
Not Fully Mission
No.
Interval
Check/Service
Procedure
Capable If:
Pump Unit
(Cont)
5
BEFORE
Cover Panels
a. Remove quick release
panels and inspect panel
gaskets for damage. Inspect
panels for damage and
cracks.
AFTER
b. Make sure the camlock
fasteners securely lock the
panels to the pump unit.
QUARTERLY
c. Wash panels with hot soapy
water and rinse with clear
water. Remove any rust with
6
QUARTERLY
Clevis &
Check that the assemblies can
Eyebolt
be removed easily from the
Assemblies
frame and are not damaged.
Check for damaged threads.
Make sure the clevis and
eyebolt assemblies are
securely in place and are free
of burrs, cracks.
7
QUARTERLY
Pump Unit
a. Inspect for damage, rust, or
Assembly
corrosion.
Change 2 2-22