TM 3-4230-237-10
0019 00
OPERATOR'S PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) Continued
Table 1. Quarterly and Annual PMCS for M12A1 DED Decontaminating Apparatus - Continued.
13
Item
Interval
Man
Item to be
Procedure
Not Fully
Mission
No.
Hour
Checked/
Capable If:
Serviced
a. Check that washers, nuts, and bolts are securely
Washers, nuts, and
QUARTERLY
Pump Unit
13
in place.
bolts are loose or
Subassembly
missing.
b. Check that centrifugal pump support is not
Centrifugal pump
broken, cracked, or dented.
support is broken
or missing.
WARNING
Fire and explosion danger exist
when solvent cleaning
compound is used. Make sure
that equipment is dry before
operations begin.
c. Clean pump unit subassembly with solvent
thoroughly. Remove any rust and corrosion with a
0019 00-8