TM 5-4610-218-12
Figure 4-122. Van Body Cable Outlet Assembly, Removal and Installation.
water purification unit as described in paragraph 4-
4-97. Preparation of Water Purification Equip-
3. Correct any deficiencies noted or report them to a
ment for Shipment.
higher authority.
a. General. The water purification unit is
d. Packing.
shipped on a truck chassis in a van body enclosure
with a 1-1/2 ton trailer. A generator is included only
(1) Pack tools, manuals, and accessories in the
for Mutual Assistance Pact Shipments.
stowage box and tag each item for identification.
(1) Prepare the truck for shipment in accord-
(2) Pack each type of chemical in a separate
ance with TM 5-4610-218-12.
crate. Do not include damaged packages or open
containers.
(2) Prepare the trailer for shipment in accord-
ance with TM 9-2330-213-14.
(3) Mark and identify each crate and its con-
tents.
(3) Prepare the
generator set for
shipment in
accordance with TM 5-6115-275-14.
(5) Complete the preparation of the unit for
shipment in accordance with preparation of equip-
b. Cleaning and Painting.
(1) Clean the water purification unit as necea-
sary.
4-88. Loading Water Purification Unit for Ship-
(2) Remove all rust or corrosion.
ment.
(3) Paint all surfaces where paint has been
a. General. The water purification equipment
damaged or removed (TM 43-0139).
will be shipped loaded in the van body and trailer.
c. Inspection. Make a complete inspection of the
clearance.
4-174