Section V. UNIT
4-9. REPLACE TOOLBOX.
TM 5-4610-233-13&P
MAINTENANCE PROCEDURES
This task covers:
a. Remove.
b. Inspect.
c. Install.
INITIAL SETUP
a. Tools. Tool Kit (Appx B, Sect Ill, Item 1).
b. Equipment Condition. Tools removed from tool box.
REMOVE
Remove two nuts (1), Iockwashers (2), screws (3), and tool box (4).
INSPECT
a. Inspect nuts and screws for damaged threads. Replace as required.
b. Inspect tool box for cracks, damaged hinge, and broken latch. Replace as required.
INSTALL
Install tool box (4), two screws (3), Iockwashers (2), and nuts(1) on hypochlorination unit (5),
END OF TASK
4-7