Section III. System Power Up
III. System Power-up and Initialization
The Main Collector/Processor power switch is inside the enclosure on the edge of the door mounted component chassis.
(Fig. 2) Each operator's station monitor has a power switch and a system main power switch and fuse panel is located in
the vicinity of the remotely mounted power source. To power up the PMS II, turn on the main system power first, then
the Main Collector/Processor and each operator's station monitor. After turning on power to the Main Unit there will be a
delay of about 2 seconds and monitoring will begin.
PMS II Operator's Instructions
Page 6