TM 55-1930-209-14&P-15
Table C-1. Preventive Maintenance Checks and Services for Miscellaneous Equipment (Continued)
B - Before
D - Daily
Q - Quarterly
D - During
W - Weekly
S - Semiannually
A - After
M - Monthly
A - Annually
ITEM
PROCEDURES
EQUIPMENT
ITEM
INTERVAL
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
4) Lower basket into well.
5) Swing yoke over basket well until end
fits over stud.
6 ) Check O-rings on cover. Replace if
damaged.
7) Be sure O-rings on cover rest in
machined groves before tightening
yoke screw securely. Do NOT over-
tighten.
e. Check that foot valve is not dogged.
Clean if necessary.
f. Inform shift leader of unusual noises or
Bilge pump motor
overheating of bilge pump motor which
overheating
may indicate a pending malfunction.
g. Log and report all corrective actions
taken and their locations to shift leader.
h. Remove rust and corrosion. Touch up
paint in accordance with TB 43-0144 as
necessary Do not paint threads or
labels.
6
Eyewash
a. Wipe eyewash stations clean.
Stations
b. Check water level. Add water if neces-
Water level low
sary.
c. Remove rust and corrosion. Touch up
paint in accordance with TB 43-0144 as
necessary. Do not paint threads and
labels.
C-9/1(C-10 blank)
