TM 55-1930-209-14&P-19
CHAPTER 4 CHLORINATION SYSTEM PMCS
Section I. General system information
4-1 Introduction. Chapter 4 contains Preventive Maintenance Checks and services for the Reverse Osmosis Water Purification
Barge Chlorination System. Operating and maintenance procedures for the chlorination system are described in detail in TM 55-
1930-209-14&P-4. TM 55-1930-209-14&P-4, Appendix C also contains I complete Preventive Maintenance Checks and Services for
the Chlorination System.
4-2 Major components. The chlorination system consists of a priming brine tank and holding tank, chlorine generation and
recirculation unit, metering pump control unit, acid tank various pumps, flowmeters, pressure gauges, and valves. In addition, there
are associated indicator lights, LED displays, fluid lines, piping, sensors, switches, and electrical circuitry. Major components of the
chlorination system, their basic functions, and their location on the barge are listed in Table 4-1.
Table 4-1. Major Components of Chlorination System
Component
Quantity
Function
Location
Chlorination
1
Generates and automatically
Void 2 port
maintains a hypochlorite solution
for treatment of ROWPU
product water entering drinking
water tanks
Chlorination unit
1
Holds hypochlorite solution, which
Void 2 port on chlo-
holding (recycle)
is circulated to the cell assembly
rination unit skid,
tank
by the recirculating pump, and
inboard of brine tank
provides chlorine to the metering
pump
Chlorination unit
1
Holds brine solution which
Void 2 port on chlo-
brine tank
is automatically added to
rination unit skid
the holding tank by the
outboard of holding
brine pump when needed
tank
Chlorination unit
1
Holds acid which is
Void 2 port on chlo-
acid tank
used to remove cell
rination unit skid
assembly scale during
outboard of holding
scale flushing operation
tank
Chlorination unit
1
Recirculates solution from
Void 2 port on chlo-
circulating pump
holding tank through cell
rination unit skid
assembly and back to holding tank
Chlorination unit
1
Automatically provides
Void 2 port on chlo-
brine pump
brine solution to the
rination unit skid
holding tank when needed
Chlorination unit
1
Controls chlorination unit
Void 2 port on chlo-
control cabinet
operation
rination unit skid on
top of power supply
Change 1 4-1