TM 55-1930-209-14&P-19
Section II
Table 4-2. Preventive Maintenance Checks and Services for ROWPU System
B -
Before
D -
Daily
Q - Quarterly
D -
During
W -
Weekly
S - Semiannually
A -
After
M -
Monthly
A - Annually
INTERVAL
ITEM
PROCEDURES
EQUIPMENT
ITEM
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
CHLORINATION
SYSTEM
WARNING
Be sure electrical power is OFF before
performing any maintenance on electrical
systems. Redtag appropriate switches
and circuit breakers with: "WARNING -
DO NOT ACTIVATE. REPAIRS BEING
MADE." Observe all safety precautions at
the beginning of this manual. Hazardous
chemical materials are used with this
equipment. Always use approved breath-
ing devices when working with chemi-
cals. Avoid chemical contact with eyes,
skin and clothing. Always wear safety
glasses, gloves, and rubber aprons when
handling chemicals.
1
All Components
NOTE
When performing BEFORE and AFTER
PMCS, make sure all circuit breakers are
open (OFF):
1. Circuit breakers P5 and P8 are
open (OFF) to panels 1 and 2.
2. Power panel circuit breaker 9P5 is
open (OFF) to chlorinate unit con-
trol panel.
3. Power panel 1 circuit breaker 10P5
is open (OFF) to metering pump
controller motor.
4. Power panel 2 circuit breaker 8P8
in open (OFF) to vent for 8 con-
troller motor.
a. .Wipe all components clean, especially
flowmeters, indicators, control panels
and electrolytic cells (Void 2 port).
b. Check for leaks paying special attention
Class III leaks.
to joints, valves, fittings and piping.
Report leaks to shift leader or bargemas-
ter for corrective action.
4-5