TM 55-1930-209-14&P-19
Table 2-4. Preventive Maintenance Checks and Services for Handling Equipment (Continued)
B -
Before
D -
Daily
Q - Quarterly
D -
During
W -
Weekly
S - Semiannually
A -
After
M -
Monthly
A - Annually
INTERVAL
ITEM
PROCEDURES
EQUIPMENT
ITEM
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
9
Crane and
a. Inspect and test interlocks for proper
Carrier Drive
clearances and freedom of operation.
Equipment
b. Inspect current collectors for shoe wear
and alignment and adjust if necessary.
c. Inspect for loose electrical connections
Connections
or damaged wiring.
loose or wiring
damaged.
d. Check oil level in gearcases and add BP
LSEP-2 ALT BEACON EP2 machine oil
if required.
e. If equipment is equipped with travel
Brakes
brakes, test operation and adjust if nec-
inoperable.
essary.
f.
Inspect lineshaft for loose bearing sup- .
Bearing support
port bolts.
bolt loose.
g. Check crossbridge conductors for
Crossbridge
bends or kinks and loose splices. Cor-
conductor bent,
rect if necessary.
kinked or loose.
h. Inspect motor mounting bolts and
Motor mounting
tighten if necessary.
bolts loose.
Change 1
13-18